| Location: | Georgia |
|---|---|
| Posted: | Aug 6, 2026 |
| Due: | Aug 25, 2026 |
| Agency: | Macon Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project consists of replacing the existing underground fuel oil system with a new above-ground system. Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the installation of Amerson Water Treatment Plant Generator Fueling System Replacement (the “Project”) will be received by the Macon Water Authority…
View BidMandatory Pre-bid Conference Date:
July 28, 2026 10:00 am
Deadline Date For Questions:
August 12, 2026 10:00 am
Bid Opening Date:
August 25, 2026

With GovernmentContracts, you can:
..., Installation of a potable well and water treatment facility. See attached document ...
State Government of Georgia
Bid Due: 9/09/2026
..., Oil, Gas, Water, etc. 96896 Water and Wastewater Treatment Services 91392 Maintenance ...
State Government of Georgia
Bid Due: 9/23/2026
...at the Blanchard Water Treatment Plant including modifications to the existing Chemical Building, ...
State Government of Georgia
Bid Due: 9/29/2026
..., Scheduling, Cost Estimation Engineering 92597 Water Supply, Treatment, and Distribution Engineering... 92596 ...
State Government of Georgia
Bid Due: 10/05/2026