| Location: | Georgia |
|---|---|
| Posted: | Aug 6, 2026 |
| Due: | Aug 25, 2026 |
| Agency: | Macon Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project consists of replacing the existing underground fuel oil system with a new above-ground system. Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the installation of Amerson Water Treatment Plant Generator Fueling System Replacement (the “Project”) will be received by the Macon Water Authority…
View BidMandatory Pre-bid Conference Date:
July 28, 2026 10:00 am
Deadline Date For Questions:
August 12, 2026 10:00 am
Bid Opening Date:
August 25, 2026

With GovernmentContracts, you can:
...New 2MG Ground Storage Tank at Fire Tower Road (Brogdon) Calhoun, City Of ...
State Government of Georgia
Bid Due: 10/06/2026
...with traditional mowing equipment that requires smaller equipment and hand work. Therefore, the ...
State Government of Georgia
Bid Due: 9/24/2026
...labor, materials and equipment for 0.9405 mile of asphaltic concrete resurfacing, construction... Design, ...
State Government of Georgia
Bid Due: 10/14/2026
...98852 Landscaping, Including Design, Fertilizing, Planting, etc., Not Grounds Maintenance or Tree... Trimming ...
State Government of Georgia
Bid Due: 9/30/2026