| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-48401-RFQ-2027-000000632 | RFQ 484-111626 ICE Services in Support of Alternative Delivery and Public-Private Partnership Projec | Transportation-2, Department Of |
Oct 16, 2026 @ 04:47 PM
|
Nov 16, 2026 @ 02:00 PM
|
Start Date: Oct 16, 2026 @ 04:47 PM ET
End Date:
Nov 16, 2026 @ 02:00 PM ET
Independent Cost Estimator (ICE) Services in Support of Alternative Delivery and Public-Private Partnership Projects
| Code | Description |
| 91119 | C.I.P., Cost Estimate Verification |
| 92544 | General Construction: Management, Scheduling, Cost Estimation Engineering |
| 96121 | Cost Estimating |
| 84571 | Civil Engineering & Materials Testing Equipment |
| 90740 | Engineering Services, Non-Licensed (Not Otherwise Classified), Including Consulting |
| 91107 | C.I.P., Architectural and Engineering Services |
| 91842 | Engineering Consulting (Inactive, please see commodity code 907-40 effective January 1, 2016) |
| 92504 | Agricultural Engineering |
| 92513 | Bridge Engineering |
| 92517 | Civil Engineering |
| 92519 | Concrete Engineering |
| 92523 | Dam Engineering |
| 92528 | Drainage Engineering |
| 92535 | Environmental Engineering |
| 92536 | Engineering Services (Not Otherwise Classified) |
| 92538 | Field Engineering |
| 92542 | Foundation Engineering |
| 92545 | Geological Engineering |
| 92546 | Geotechnical Engineering |
| 92549 | Highways, Streets, Airport Pay-Parking Lots Engineering |
| 92551 | Hazardous Waste Engineering Services, Including Remedial Investigations and Feasibility Studies for |
| 92555 | Inspecting, General Engineering |
| 92556 | Inspecting, Structural Engineering |
| 92588 | Structural Engineering |
| 92592 | Value Engineering and Value Analysis, Professional |
| 92594 | Tunnels and Subways Engineering |
Curtis Scott
cuscott@dot.ga.gov
404-463-1427
Date Posted: October 16, 2026
Office of Engineering Design Procurement
One Georgia Center
600 West Peachtree Street NW
Atlanta Georgia 30308
REQUEST FOR QUALIFICATIONS
Independent Cost Estimator (ICE) Services in Support of Alternative Delivery and
Public-Private Partnership Projects
RFQ 484-111626
Statement of Qualifications Due: November 16, 2026
1
Date Posted: October 16, 2026
REQUEST FOR QUALIFICATIONS
I. General Project Information
A. Overview
The Georgia Department of Transportation (GDOT) is soliciting Statements of Qualifications
(SOQs) from qualified firms to provide Independent Cost Estimator (ICE) services in support
of Alternative Delivery projects, including Public-Private Partnership (P3) projects,
administered by GDOT's P3 Division. Projects may utilize delivery methods and contractual
structures including, but not limited to, Design-Build (DB), Construction Manager/General
Contractor (CM/GC), and P3 arrangements implemented through Comprehensive
Development Agreements (CDAs). The selected firm will provide services for the project or
related projects identified in Exhibit I-1.
GDOT reserves the right to reject any or all Statements of Qualifications and Technical
Approaches and to waive technicalities and informalities at GDOT's discretion.
B. Restriction of Communications
From the date of advertisement of this solicitation until the successful firm is selected and
the award is officially announced, each firm is strictly prohibited from communicating in any
way regarding this solicitation or the associated scope of work with any GDOT staff,
including the Commissioner and GDOT Board Members. This restriction applies to all
potential firms and will be strictly enforced.
The only exception to this restriction is for the purpose of obtaining a Consultant Evaluation
Form to support a project being included in the SOQ submittal.
All questions or requests for clarification regarding any aspect of this RFQ must be submitted
in writing via email to:
Curtis Scott
cuscott@dot.ga.gov
Deadlines for the submission of questions are listed in the Schedule of Events section of this
RFQ.
Method of Communication
All general communication regarding this solicitation, including updates, clarifications, and
official announcements, will be posted to the Georgia Procurement Registry (GPR) under
this RFQ. It is the responsibility of all interested firms to monitor the GPR regularly for such
information.
GDOT reserves the right to communicate directly via email with the primary contact listed in
the submitted Statement of Qualifications (SOQ). Additional communications may be
conducted as specified elsewhere in this RFQ.
2
| PHASE I | DATE | TIME |
|---|---|---|
| a. GDOT issues a public advertisement for this RFQ. | 10/16/2026 | -------- |
| b. Deadline for submission of written questions and requests for clarification | 11/02/2026 | 2:00 PM |
| c. Deadline for submission of SOQs | 11/16/2026 | 2:00 PM |
Date Posted: October 16, 2026
C. Contract Term and Type
GDOT anticipates awarding one (1) Multi-Phase, Project-Specific contract to one (1) firm
for the project or related projects identified in the applicable Exhibit. The payment type
through individual task orders may be Lump Sum, Cost Plus Fixed Fee, Cost per Unit of
Work, or Specific Rate of Compensation. The contract will remain in effect through
completion of the authorized services for the project or related projects, subject to the terms
of the Agreement. Each phase will be separately negotiated and authorized through a task
order.
D. Contract Amount
A maximum allowable compensation amount will be established for the Multi-Phase,
Project-Specific contract to serve as a ceiling for the total contract value. This ceiling may
not be exceeded unless formally adjusted through a contract modification. The solicited
scope of services will be divided into distinct phases, with each phase to be negotiated and
authorized individually through a task order. The specific scope of work and associated
costs for each phase will be determined as the project or related projects covered by the
contract progress.
E. Scope of Services
Under the resulting Agreement, the selected firm will perform the services defined in the
applicable Exhibit through authorized task orders. References to project phases do not
require design services unless expressly included in that scope. Reviews of design or
construction documents do not, by themselves, assign responsibility for preparing those
documents.
F. Schedule of Events
The schedule below represents GDOT's estimated schedule. All times indicated are Eastern
Time. GDOT reserves the right to adjust the schedule as GDOT deems necessary.
PHASE I DATE TIME
a. GDOT issues a public advertisement for this RFQ. 10/16/2026 --------
b. Deadline for submission of written questions and requests for 11/02/2026 2:00 PM
clarification
c. Deadline for submission of SOQs 11/16/2026 2:00 PM
G. Minimum Qualifications
1. Area Class Prequalification
No GDOT prequalification Area Classes are specified for this solicitation because the
requested services require specialized independent cost estimating expertise that may
extend beyond the Department's established Area Classes. This approach is intended to
broaden competition and allow consideration of qualified firms, including those that are
not currently prequalified under GDOT Area Classes. Firms will be evaluated based on
3
Date Posted: October 16, 2026
their demonstrated qualifications, relevant experience, and ability to perform the
advertised services, subject to all other applicable solicitation requirements.
2. Specialized Independent Cost Estimating Experience
The Prime Consultant must demonstrate experience delivering services of similar
complexity, size, scope, and function to those identified in Exhibit I-1. The proposed
Consultant Team must demonstrate:
a. At least ten (10) years of experience with contractor-style, production-based, bottom-
up estimating, including independent quantity take-offs and knowledge of construction
means, methods, and equipment used on complex heavy civil, highway, or bridge
projects.
b. Experience using HCSS or similar production-based estimating software. Parametric,
average-cost, RSMeans, or database estimating methods are not acceptable
substitutes for the required contractor-style, production-based, bottom-up estimating
approach.
c. Experience with CM/GC, Design-Build, Public-Private Partnership, or Comprehensive
Development Agreement projects, including an understanding of the delivery methods
and the roles and responsibilities of the parties involved.
d. Experience working with owners, designers, and contractors as an Independent Cost
Estimator, together with experience working directly on a contractor's staff.
e. Experience identifying, assessing, mitigating, and pricing project risks.
f. Experience developing construction schedules for large, complex transportation
projects.
g. Experience participating in constructability and value engineering workshops and
identifying innovative alternatives to reduce costs or save time.
3. Personnel Qualifications and Supporting Information
Proposed personnel must satisfy the position-specific minimum qualifications identified
in Section IV.C. Firms must demonstrate the qualifications and experience required by
this section through the personnel information submitted under Section IV.C and the
project experience submitted under Section IV.E.
II. Selection Method
Following the responsiveness review and prescreening of the Statements of Qualifications,
GDOT will determine whether to conduct separate Phase I and Phase II evaluations or a
combined Phase I and Phase II evaluation. This determination will be based on the number of
responsive SOQs received and the efficient administration of the selection process. The
evaluation process selected by GDOT will not alter the evaluation criteria or weights identified
in this solicitation.
A. Separate Phase I and Phase II Evaluation
When GDOT determines that separate Phase I and Phase II evaluations are appropriate,
individual Selection Committee members will review each responsive firm's SOQ using the
Phase I selection criteria and weights identified in this solicitation before the Phase I group
evaluation meeting. When a competitive range is needed, individual committee members
will rank the firms, and the sum of their rankings will determine the competitive range. When
GDOT determines that all responsive firms will be discussed and evaluated by the Selection
4
Date Posted: October 16, 2026
Committee as a group, individual committee members will review each firm's SOQ before
the group meeting, but will not rank firms to establish a competitive range.
During the Phase I group evaluation meeting, the Selection Committee will discuss and
evaluate all responsive firms or the firms within the competitive range, as applicable, and
assign a group rating for each Phase I evaluation criterion, resulting in a Phase I group score
and final ranking of the top submittals. Based on the group scores, the most highly qualified
firms will be shortlisted to participate in Phase II.
Each shortlisted firm will be notified by email to participate in Phase II of the evaluation
process. The notification will include all due dates, additional details, and requirements
beyond those provided in the solicitation.
Before the Phase II group evaluation meeting, individual Selection Committee members will
review each shortlisted firm's Technical Approach without assigning individual rankings.
During the meeting, the Selection Committee will discuss and evaluate all shortlisted firms
as a group using the Phase II selection criterion and weight identified in this solicitation and
assign a group rating resulting in a Phase II group score.
B. Combined Phase I and Phase II Evaluation
When GDOT determines that a combined Phase I and Phase II evaluation is appropriate,
all responsive firms will be shortlisted to participate in Phase II. Each shortlisted firm will be
notified by email to participate in Phase II of the evaluation process. The notification will
include all due dates, additional details, and requirements beyond those provided in the
solicitation. Before the combined evaluation meeting, the individual Selection Committee
members will separately evaluate each firm's Phase I SOQ and Phase II Technical
Approach using the respective selection criteria and weights identified in this solicitation.
During the combined evaluation meeting, the Selection Committee will first discuss and
evaluate each firm's Phase I SOQ as a group and assign a group rating for each Phase I
evaluation criterion, resulting in a Phase I group score. The Selection Committee will then
separately discuss and evaluate each firm's Phase II Technical Approach as a group and
assign a group rating for the Phase II evaluation criterion, resulting in a Phase II group score.
C. Final Selection
Upon completion of the applicable evaluation process, the Phase I and Phase II group
scores for each firm will be added together to determine a total score, and the firms will be
ranked in order of preference.
GDOT will initiate negotiations with the top-ranked firm to finalize the scope, compensation,
fees, and other terms and conditions of the contract. If a satisfactory agreement cannot be
reached, GDOT will formally terminate negotiations with that firm and may initiate
negotiations with the next highest-ranked firm. GDOT may continue this process in order of
ranking until a satisfactory agreement is reached and a contract is executed.
III. Selection Criteria and Weights
The Selection Committee will evaluate the Phase I Statements of Qualifications and Phase II
Technical Approaches using the criteria and weights identified below. Phase I accounts for 60
percent of the total evaluation score, and Phase II accounts for 40 percent.
5
Date Posted: October 16, 2026
A. Phase I Selection Criteria
The following criteria and weights will be used to evaluate and score the Phase I Statements
of Qualifications:
1. Project Manager and Key Team Leaders - Experience and Qualifications: 30%
Evaluation will be based on the proposed personnel's relevant qualifications and
experience performing independent cost estimating and scheduling services for
transportation and heavy civil projects. Consideration will include contractor-style,
production-based, bottom-up estimating; construction means and methods; alternative
delivery experience; risk assessment and pricing.
2. Resources and Workload Capacity: 20%
Evaluation will be based on the availability and workload capacity of the proposed Project
Manager, Key Team Leaders, and supporting resources; the adequacy of the resources
available to perform the advertised services; and the firm's ability to meet project
schedules.
3. Prime Consultant Past Performance: 10%
Evaluation will be based on the Prime Consultant's experience and past performance
delivering services of similar complexity, size, scope, and function. Consideration will
include the firm's performance in preparing independent estimates, reconciling estimate
differences, supporting successful price negotiations, and meeting quality and schedule
requirements. Past performance will be assessed using the information and Evaluation
Forms submitted with the SOQ and relevant experience or project knowledge held by
members of the Selection Committee.
B. Phase II Selection Criterion
The following criterion and weight will be used to evaluate and score the Phase II
Technical Approaches:
Technical Approach: 40%
Evaluation will be based on the firm's understanding of the advertised services and its
proposed methods for developing independent cost estimates and schedules; assessing
and pricing risks; validating developer or contractor pricing; reconciling estimate
differences; and supporting GDOT during negotiations. Consideration will also include the
firm's approach to maintaining independence while collaborating with the project team,
coordinating personnel and subconsultants, addressing project challenges, and
performing quality assurance and quality control. Consideration will also be given for
providing any specific qualifications, skills, software suites, tools, and knowledge that may
uniquely benefit the firm and project.
C. Presentation/Interview
GDOT reserves the right to request a presentation or interview when determined to be in
GDOT's best interest. If requested, the presentation or interview will be evaluated as
part of the Technical Approach.
6
Date Posted: October 16, 2026
IV. Instructions for Content and Preparation of the Phase I Statement of
Qualifications
The Phase I Statement of Qualifications must be prepared in accordance with the instructions
provided in this section. The SOQ must respond to all requested information and be organized
using the required headings, numbering, and lettering shown in red.
The Phase I SOQ must be prepared as one complete PDF document in portrait orientation on
8.5-by-11-inch paper, except that the Organizational Chart and personnel commitment tables
may be submitted in portrait or landscape orientation on 8.5-by-11-inch or 11-by-17-inch
paper. Use a minimum 11-point font. Number all pages and comply with the page limits stated
for each section. Hyperlinks and embedded videos must not be included. The firm must
provide only the information requested. Additional pages and unsolicited information must not
be included.
Standalone divider, separator, and section-identification pages must not be included. Each
section with a stated page limit must begin on a new page and must not exceed the applicable
limit.
A. Phase I Cover Page
The Phase I SOQ must include a cover page identifying the following information:
1. Phase I Statement of Qualifications
2. RFQ Number
3. RFQ Title
4. Firm's Full Legal Name
5. Contract Description shown in Exhibit I-1
Page Limit: The Phase I Cover Page is excluded from the page count.
B. Administrative Requirements
Restrictions on Inclusion of GDOT Employees and Personnel Disclosure
A current GDOT employee must not be included as a member of the proposed consultant
team. Inclusion of a current GDOT employee on the proposed team will make the SOQ
nonresponsive.
Firms may identify current GDOT employees as project managers or contacts for previous
projects or contracts, or as references or evaluators of the firm's past performance. Such
a reference must not imply that the individual is part of the proposed consultant team.
The firm must ensure that every individual identified as a proposed team member has been
informed of and agreed to the proposed role. The firm must not identify an employee of
another firm, including a proposed subconsultant, without the individual's knowledge and
the concurrence of the individual's current employer. The current employer of every
proposed individual must be clearly identified.
1. Addendum or Addenda
For each Addendum issued for this RFQ, the firm must include only the signed
Addendum cover page. The remaining pages of the Addendum must not be included. If
no Addendum was issued, the firm must state "No Addendum Issued."
Page Limit: Signed Addendum cover pages are excluded from the page count.
7
| Firm's Full Legal Name | ||
|---|---|---|
| Prime Consultant: [Insert Full Legal Name] | ||
| Subconsultant: [Insert Full Legal Name] | ||
| Subconsultant: [Insert Full Legal Name] |
Date Posted: October 16, 2026
2. Basic Company Information
a. Company Name: Provide the full legal name of the company.
b. Company Headquarters Address: Provide the complete address of the company
headquarters.
c. Primary Contact Information: Provide the name, telephone number, and email
address of the individual who will serve as the primary contact for this solicitation.
d. Georgia Office Locations: Identify each office located in Georgia and provide its
complete address. If the firm has no Georgia office, state "No Georgia Office."
e. Staffing in Georgia Offices: Provide the number of employees and the disciplines
represented at each Georgia office.
f. Ownership Structure: Identify the form of ownership, state of residency or
incorporation, and number of years the firm has been in business.
g. Proposed Consultant Team List: Provide a complete list of the firms included in the
proposed consultant team. List the Prime Consultant first, followed by each proposed
Subconsultant, using each firm's full legal name. Only firms included in the Proposed
Consultant Team List will be included in the resulting contract.
The Prime Consultant is the firm submitting the Statement of Qualifications and the
firm that will contract directly with GDOT.
Subconsultants are generally considered team members performing professional
services that are subject to the Audit and Accounting System Requirements, and
whose services are billed as costs. Subconsultant team members must be included
in the resulting agreement and are subject to its terms and conditions.
Vendors are generally considered firms providing goods or ancillary services that are
not subject to the Audit and Accounting System Requirements, and whose services
are billed as direct expenses. Vendors must not be included in the Proposed
Consultant Team List. Vendors will not be included in the resulting agreement and
will not be subject to its terms and conditions.
Firm's Full Legal Name
Prime Consultant: [Insert Full Legal Name]
Subconsultant: [Insert Full Legal Name]
Subconsultant: [Insert Full Legal Name]
The firm must provide only the information requested in this subsection. Additional or
unsolicited information must not be included and will not be considered.
Page Limit: Basic Company Information, including the Proposed Consultant Team
List, is excluded from the page count.
8
Date Posted: October 16, 2026
C. Experience and Qualifications
The firm must provide the information requested below for the proposed Project Manager and
each required Key Team Leader. Identify each position using the titles below and in Exhibit I-
1.
The firm must not leave any requested personnel-information item blank. If an item does not
apply to the proposed individual, state "Not Applicable" or "N/A."
Personnel Assignments
The Principal, Project Manager, and Lead Estimator requirements may be met by the same
individual, provided that individual satisfies the qualifications for each position. Additionally, the
Principal, Project Manager and Lead Estimator must be employees of the prime consultant.
At least two (2) individuals must be proposed as Discipline-Specific Estimators. These
individuals may also serve as the Principal, Project Manager, and/or Lead Estimator if they
meet the applicable qualifications. A Discipline-Specific Estimator serving in any of those
additional roles must be an employee of the Prime Consultant.
The Discipline-Specific Estimators and Scheduler may be employees of the Prime Consultant
or proposed subconsultants.
The Quality Control Lead may be an employee of the Prime Consultant or a proposed
subconsultant.
For each individual proposed for more than one position, provide the information required for
each position within its applicable page limit and explain how the individual will maintain
sufficient availability to perform the assigned responsibilities.
1. ICE Project Manager
Provide the following information for the proposed Project Manager:
a. Current Employment: Identify the firm where the individual is currently employed and
the number of years employed by that firm.
b. Education: Identify the individual's degrees and relevant academic credentials. The
individual must have a degree in Construction Management, Civil Engineering, or a
related field.
c. Professional Registration: Identify the individual's applicable professional licenses or
registrations.
d. Project Management Experience: Demonstrate at least ten (10) years of experience in
responsible charge of managing large-scale heavy civil or transportation-related projects.
e. Field Operations Management and Estimating Experience: Demonstrate at least ten
(10) years of experience in Field Operations Management and estimating from a
contractor's perspective.
f. Alternative Delivery Experience: Describe the individual's experience with alternative
delivery projects, including Design-Build and CM/GC. This experience is preferred.
g. Relevant Transportation Project Management Experience: Describe the individual's
experience managing relevant transportation projects. This experience is preferred.
Page Limit: Two pages maximum.
9
Date Posted: October 16, 2026
2. Key Team Leaders
Provide the following information for each required Key Team Leader.
Lead Estimator
Provide the following information for the proposed Lead Estimator:
a. Current Employment: Identify the firm where the individual is currently employed and
the number of years employed by that firm.
b. Education: Identify the individual's degrees and relevant academic credentials. The
individual must have a degree in Construction Management, Civil Engineering, or a
related field.
c. Professional Registration: Identify the individual's applicable professional licenses or
registrations.
d. General Estimating Experience: Demonstrate at least ten (10) years of hard-bid general
estimating experience.
e. Lead Estimator Experience: Demonstrate that at least ten (10) years of the required
estimating experience were as a lead estimator for a contractor.
f. Alternative Delivery Experience: Describe the individual's experience with alternative
delivery projects, including Design-Build, Public-Private Partnerships, and CM/GC. This
experience is preferred.
g. Relevant Transportation Estimating Experience: Describe the individual's experience
as a lead estimator on relevant transportation projects using contractor-style, bottom-up
estimating and HCSS or similar software. This experience is preferred. Parametric,
average-cost, RSMeans, or database estimating methods are not acceptable substitutes
for the required estimating approach.
Page Limit: One page maximum.
Discipline-Specific Estimators
Propose at least two (2) Discipline-Specific Estimators in disciplines of the firm's choice that
are relevant to the advertised scope of services. Provide the following information for each
individual:
a. Current Employment: Identify the firm where the individual is currently employed and
the number of years employed by that firm.
b. Education: Identify the individual's degrees and relevant academic credentials.
c. Professional Registration: Identify the individual's applicable professional licenses or
registrations.
d. Relevant Estimating Experience: Demonstrate at least ten (10) years of experience
estimating complex highway projects from a contractor's perspective using contractor-
style, production-based, bottom-up estimating and HCSS or similar software. Parametric,
average-cost, RSMeans, or database estimating methods are not acceptable substitutes
for the required estimating approach.
e. Independent Estimating Experience: Describe the individual's experience developing
estimates as an independent estimator for a transportation agency using Design-Build,
CM/GC, or similar delivery methods. This experience is desirable.
10

With GovernmentContracts, you can:
...Project: CONSTRUCTION TIME AND MATERIALS Ref. #: RFP 27-261110 Type: RFP Status: Open ...
Paulding County School District
Bid Due: 12/10/2026
...CONSTRUCTION TIME AND MATERIALS Paulding County School District Nov 10, 2026 @ 09:31 ...
State Government of Georgia
Bid Due: 12/10/2026
...Construction Manager at Risk (CMAR) Preconstruction and Construction Services for Middle Oconee WRF... ...
State Government of Georgia
Bid Due: 12/17/2026
...Follow Prefabrication Training Venues and Construction Supplies Active Contract Opportunity Notice...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 12/29/2026