Request For Proposals
Architectural & Engineering Design
Services for Bicentennial
Elementary School Roof
Replacement
Sealed proposals must be submitted no later than 2:00 p.m. on Thursday September 3, 2026.
Proposals will be publicly opened at the SAU 42 Plant Operations Office, 38 Riverside Street,
Nashua, New Hampshire. The contents of all proposals will be open to inspection by interested
parties, either at the time of opening or by appointment thereafter.
City of Nashua, NH
Joint Special School Building Committee
Request For Proposals
Architectural & Engineering Design Services for
Bicentennial Elementary School Roof Replacement
The City of Nashua, NH Joint Special School Building Committee (JSSBC) is interested in
procuring architectural and engineering design services to replace the entire roofing system
at Bicentennial Elementary School. Depending on funding there may be additional school
roofs to replace in the coming years.
I. Background Information
The Nashua Public School District (NSD) consists of approximately 10,000 students
enrolled in grades K-12. Facilities include 12 Elementary Schools, three Middle Schools,
two comprehensive Senior High Schools and a Pre-School and HS Special Needs
alternative school. All 18 schools are accredited by the New England Association of
Schools and Colleges, and fully approved by the New Hampshire State Department of
Education. The JSSBC oversees all large construction/renovation projects to the public
schools.
The Bicentennial Elementary School roof was installed circa 1996 during the school’s last
renovation project. It is a Carlisle EPDM roof membrane and is ballasted. The school is
approximately 65,000 square feet and predominately single story. Our desire is to release
construction drawings to prospective roofing contractors by early January 2027, with a
strong goal of roof replacement work starting as soon as the current school year ends in
June 2027.
An assessment of the roof was conducted by the school district’s roofing consultant, ARM
Consultants in 2024. A copy of that assessment is attached as Appendix B. All
deficiencies labeled “red” or “blue” were subsequently repaired by the school district.
If funds are identified the City will proceed with similar roof replacements at a number of
schools including Fairgrounds Elementary, Ledge Street Elementary, Charlotte Avenue
Elementary and New Searles Elementary (not necessarily in that order). Funding decisions
are typically made in the spring of each year, so re-roofing design work will commence that
summer with a goal of replacement the following summer.
II. Scope of Work
The scope of this project involves architectural/engineering design services related the
installation of new roofing at Bicentennial Elementary School, including study, review and
recommendations, schematic design, design development, final design, bidding, and
contract administration. We desire to replace the roof with a fully adhered EPDM roof and
obtain a 20 year warrantee on the membrane. We also hope to eventually install solar
panels on the roof to help offset electrical utility costs.
Proposals must include all architectural design costs, including all related engineering
expenses. A fee schedule reflective of the proposed contract values and percentages shall
be based on the following phases:
• Schematic Design
• Design Development
• Construction Document
• Bidding & Negotiation
• Construction
Additionally, all fees, anticipated reproduction costs and reimbursable expenses must be
represented within your proposal by category, in the form of a not to exceed allowance per
category.
The City of Nashua will provide its own financing and pay for the design/construction
administrative services in accordance with the provisions outlined in AIA Document B141
(modified), Standard Form of Agreement Between Owner and Architect. It is expected that
your pricing will be carefully done as requests for last minute adjustments will not be
considered and may disqualify your company. Proposals must be guaranteed for ninety
(90) days from the date of receipt.
Architectural/Engineering plans of the school are available for viewing at the Plant
Operations Office at 38 Riverside Street.
The City of Nashua is a member of many municipal associations and consortiums
throughout the United States. If your company is under agreement with the same, the
minimum pricing applies that has been established in the terms and conditions of that
agreement.
III. Proposals
Proposals must include the following information:
1. A statement of the architect/engineering team's understanding of the work to be done.
2. A general profile of the firm, including location of the office from which the work will be
done, type of activities conducted by the firm, and information regarding the date of
incorporation and corporate status.
3. Composition of the design team to include all consulting organizations (e.g.,
Structural).
4. Experience designing school roof replacements, knowledge of school construction
requirements and procedures, and understanding of educational program planning.
5. The names and roles of individuals who will be consulting on this project, and their
education, experience and qualifications. (This information can be presented with
resumes.)
6. The architect/engineer's approach to the design process with the school community,
general community, and Building Committees.
7. Written and/or visual profiles of past and present projects representative of the work
of the firm, particularly in relation to school construction projects, including contract
values and percentage of completion.
8. The name and addresses of clients for whom projects have been conducted in the
past five years (particularly in relation to school construction projects). Include
telephone numbers, email addresses and names of contacts for reference purposes.
9. The individual construction budget total for projects completed in the last five (5)
years, including the variance (positive or negative) between the projected construction
budget and actual bid results, and the number of change orders for each project with
their positive or negative affect on the budget.
10. A certified or authenticated financial statement, dated within six months prior to
the proposal submission. Further verification may be required.
11. A statement regarding any past, present or pending litigation with an owner or
governmental regulatory agency.
12. Such additional information as may be required to demonstrate the respondent
is adequately prepared in technical experience to fulfill the contract.
13. Certificate of architectural design and liability insurance, and a list of any and all
claims filed against the same.
14. Your fees associated with this re-roofing project, including all phases of the design
process, construction administration and reimbursable expenses.
15. The name, address and phone number of the firm and contact person for this
proposal.
16. A signature on the proposal by an authorized individual of the firm.
IV. Selection Process
Prospective Architectural-Engineering firms are invited to participate in the selection
process. Each is expected to prepare a written proposal (2 copies required), to be
submitted to the Owner not later than 2:00 p.m. on Thursday, September 3, 2026
Proposals may be mailed or hand delivered to the following Address:
Shawn M. Smith, Director of Plant Operations
38 Riverside Street
Nashua, New Hampshire 03062
All proposals will be opened at the above date, time and place and will be available for
inspection (and thereafter by appointment) by interested parties.
It is expected that the Architect-Engineering Firm will be selected no later than the end of
September 2026.
VI. Form of Agreement
The form of agreement between Owner and Architect shall be AIA Document B141
(modified), Standard Form of Agreement Between Owner and Architect.
VII. On-site Inspection and Further Information
If you wish to view the site before providing your proposal, please contact Shawn Smith,
Director of Plant Operations, or Gary Connors, Assistant Director, at (603) 966-150. Also for
further information or questions
Additional general terms and conditions are provided in Appendix A.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.