| Location: | Texas |
|---|---|
| Posted: | Dec 22, 2025 |
| Due: | Jan 21, 2026 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 0006721 |
| Publication URL: | To access bid details, please log in. |
0006721
Posted
James Gonzalez
(512) 936-0647
james.gonzalez@tfc.texas.gov
1/21/2026
3:00 PM
303
21+ Days for Solicitation Notice
12/22/2025
12/22/2025 11:49 am
90922-Building Construction, Non;
90923-Building Construction, Residential (Apartments, Etc.);
90924-Building Construction, Commercial And Institutional;
90925-Building Construction, Prefabricated (All Types);
90930-Building Construction (Not Otherwise Classified);
90976-Site Work;
90977-Special Construction: Observatory, Security, Special Rooms, Etc.;
91115-C.I.P., Construction and Rehabilitation, Other than Buildings;
91116-C.I.P., Construction and Rehabilitation, Buildings;
91122-C.I.P., Demolition Contract;
91140-C.I.P., Land Surveying Services;
|
Description |
|
|
909-22 |
Building Construction, Non-Residential, Office Building, etc. |
|
909-23 |
Building Construction, Residential, Apartments, etc. |
|
909-24 |
Building Construction, Commercial and Institutional |
|
909-25 |
Building Construction, Prefabricated, All Types |
|
909-30 |
Building Construction, (Not Otherwise Classified) |
|
909-76 |
Site Work |
|
909-77 |
Special Construction: Security, Special Rooms, etc. |
|
911-15 |
C.I.P., Construction and Rehabilitation, Other than Buildings |
|
911-16 |
C.I.P., Construction and Rehabilitation, Buildings |
|
911-22 |
C.I.P., Demolition Contract |
|
912-40 |
Demolition Services |
SCOPE: In accordance with the provisions ofTexas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-RiskMethod, and Rules and Procedures adopted by the Texas Facilities Commission(TFC), TFC is requesting qualifications for a Construction Manager-at-Risk(CMR) to provide Pre-Construction and construction management services for theTFC INS Demolition & New Building - Office of the Governor located at 1100San Jacinto Blvd, Austin, TX 78701, hereinafter described as TFC Project #25-031-3105 (the Project). This Project will be administered by TFC. Thisprocurement will be a two-step award process with a two-part work requirement.
A. Step One of the solicitation will include asubmittal of company experience and qualifications focusing on projects ofsimilar size and type. Respondents will be evaluated on experience andqualifications, as detailed in Section V, Submission Requirements. Only thehighest ranked 5 or fewer Respondents will be shortlisted based on thisevaluation and invited to participate in interviews. Based on the interviews,the short-listed firms may be invited to participate in Step Two.
B. Step Two of the solicitation will includethe short-listed firms participating in interviews. The short-listed firmsparticipating in the interviews may be requested to submit pricing informationrelated to indirect construction costs as detailed in Section V, SubmissionRequirements.
COST OF WORK: Respondents to this RFQ shouldconsider the Cost of Work for Phase 1 of Pre-Construction, abatement, existingbuilding demo, excavation, and parking structure as Eighty-Five Million dollars($85,000,000.00) to begin the project. Overall budget will be reevaluated nextyear in Q2 prior to upcoming legislative session, and additional funds will berequested to complete the project.
CONTRACT TERM: The preliminary/targetedcumulative Pre-Construction and Demo period is estimated to be 305 calendardays and the cumulative Construction period is 655 calendar days for a totalcontract term of 960 calendar days except as may be otherwise amended or negotiated.
Approximate cost of construction for theproject is estimated to be eighty-five million dollars ($85,000,000) to beginthe project. Overall Budget will be reevaluated mid-2026 prior to upcominglegislative session, and additional funds will be requested to complete theproject.
At the time of this RFQ issuance, the Ownerhas engaged Square One Consultants as the Owner’s Representative (ProjectManagement Firm) to manage this project. Square One will work at the directionof the Owner to assist the project team (including the architect, designsubconsultants, engineers and contractor) in reviewing design &constructability options, cost estimates, current technologies and otherrelevant design & construction issues.
MANDATORYPRE-SUBMITTAL TELECONFERENCES: Mandatory pre-submittal teleconferences will beheld on Tuesday, January 13, 2026 at 10:00 AM and Wednesday, January 14, 2026at 10:00 AM. Pre-registration is required to participate in the teleconference.Respondents must have an employee of their firm attend at least one (1) of thetwo (2) pre-submittal conferences. TFC shall reject qualifications submitted byfirms that did not attend one of the mandatory pre-submittal conferences.
TFC is using the eProcurementsystem Bonfire. Respondents mustregister for a Bonfire account (No Charge) to submit a response. Respondents must submit theirresponses/submittals at the following link: https://tfcstate.bonfirehub.com/opportunities/215020
|
EVENT |
DATE |
|
Issue RFQ |
12/22/2025 |
|
Mandatory Pre-Submittal Teleconferences 1st PSC 2nd PSC |
1/13/2026, 10:00 AM 1/14/2026, 10:00 AM |
|
Site Visit |
1/14/2026, 2:00 PM |
|
Deadline for Submission of Questions |
1/15/2026 |
|
Deadline for Submission of Qualifications and HSP |
1/21/2026, 3:00 PM |
|
Notification of Short List/Interview Selection |
1/28/2026 |
|
Interviews |
2/10/2026 |
This Request for Qualifications (RFQ)is posted on the Electronic State Business Daily (ESBD) located on the TexasComptroller of Public Accounts’ web page located at
https://www.txsmartbuy.com/esbddetails/view/0006721
This website will have the most currentinformation during the solicitation.

With GovernmentContracts, you can:
...Addendum No. 2 - RFQ 2026.09 CDBG Grant Engineering/Architectural/Surveying Services Addendum No.... 2 ...
County of Calhoun
Bid Due: 6/04/2026