NOTICE TO PROSPECTIVE BIDDERS
Contract No.: PRB.35493
Federal Aid No.: Helene Relief
TIP No.: N/A
WBS Element: 51830.2.13.44, 51830.2.13.50, 51830.2.13.52, 51830.2.13.56
Letting Date: May 27, 2026
This letter is to advise all prospective bidders of the following contract addendum:
Proposal Changes: Proposal updated to reflect permit changes to Site 100-01-00204 (Wheeler Rd),
Site 059-01-5d1d5 (Davistown Rd), and Site 061-01-f64aa (Hefner Rd).
Plan Changes: Plan sheet S-1 replaced to Site 100-01-00206 (Timeless Lane) to reflect
temporary work bridge and limits of causeway.
Follow up Questions:
1.The Hefner Rd bridge reflects 1’6” cored slabs. Can 1’9” be used and change the
grades?
Answer: 1’6” cored slabs are available
2. Will we be able to completely put in a temporary causeway to cross the cane river for
girder deliver and erection?
Answer: Property owners and drill crew continue to use a temporary gravel access. It is
anticipated this access can be used for construction of the bridge as well.
3. Borings?
Answer: Borings for Hefner 061-01-f64aa (Hefner) and Davistown (059-01-5d1d5) have
been posted to the website.
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION THIRTEEN
55 ORANGE STREET
ASHEVILLE, NC 28801-2340
Telephone: (828) 250-3000
Fax: (828) 251-6394
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
55 ORANGE STREET
ASHEVILLE, NC 28801-2340
2
Sincerely,
Chad Loftis
Division Contracts Engineer
Cc: Tim Anderson, P.E., Division Engineer
Kristin Moyle, NCDPS/NCEM
Chris Deyton, P.E., Deputy Division 13 Engineer
Nathan Moneyham, P.E., Division 13 Construction Engineer
Gabriel Johnson, P.E., Division 13 Project Manager
Steve Cannon, P.E., Division 13 Project Development Engineer
Brendan Merithew, P.E., Division 13 Project Team Lead