USCG STA Sand Key Repair Fuel Dispensers

Location: Florida
Posted: Mar 9, 2026
Due: Mar 20, 2026
Agency: HOMELAND SECURITY, DEPARTMENT OF
Type of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 30321PR260000003
Publication URL: To access bid details, please log in.
Follow
USCG STA Sand Key Repair Fuel Dispensers
Active
Contract Opportunity
Notice ID
30321PR260000003
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
BASE MIAMI(00028)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • Updated Published Date: Mar 09, 2026 01:05 pm EDT
  • Original Published Date: Feb 23, 2026 08:30 am EST
  • Updated Date Offers Due: Mar 20, 2026 03:00 pm EDT
  • Original Date Offers Due: Mar 10, 2026 03:00 pm EDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Apr 04, 2026
  • Original Inactive Date: Mar 25, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z2NA - REPAIR OR ALTERATION OF FUEL SUPPLY FACILITIES
  • NAICS Code:
    • 237120 - Oil and Gas Pipeline and Related Structures Construction
  • Place of Performance:
    Clearwater Beach , FL 33767
    USA
Description

This combined synopsis/solicitation for construction services prepared in accordance with the

format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional

information included in this notice. This synopsis/solicitation is being advertised as Small

Business Set-Aside only. This announcement constitutes the only solicitation; no separate written

solicitation will be issued.





The solicitation number is 30321PR260000003. Applicable North American Industry Classification



Standard (NAICS) codes are:



237120 - Oil and Gas Pipeline and Related Structures Construction



This requirement is for a fixed price contract. The contract will be awarded using simplified

acquisition procedures in accordance with FAR part 13 and part 15

The Government will award a contract resulting from this solicitation to the responsible offeror

whose offer conforming to the solicitation will be most advantageous to the Government, Best Value.



When submitting your proposals, request a price breakdown of the following:

a. Cost of materials and equipment

b. Cost of labor



Contract will be awarded to the vendor who can provide Best value which includes all labor,

material, cost and equipment required within the SOW. Cost and Past Performance factors will also

be considered when selecting the award.



Anticipated award date: 10 business days after close of solicitation, OOA 20 March 2026





Quotes are to be received no later than close of business (3 p.m.) on 10 March 2026 and are to be

sent via e-mail to angel.melendez@uscg.mil



Location of Work:



1375 Gulf Blvd. Clearwater FL, 33767



POC:



Zachery Little Zachery.T.Little@uscg.mil

(206) 820-4819



James Pinto James.E.Pinto@uscg.mil

(727) 596-8666 X 105





Quotations sent via the US Postal Service or hand delivered should be sent to:

Commanding Officer



USCG Base Miami Beach (P&C)



Attn: Angel Melendez

12100 SW 152ⁿᵈ ST Miami, FL 33177.



Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable)

will be issued in SAM (www.sam.gov).



Wage determinations: FL20240184 01/05/2024



SCOPE OF WORK:





CONTRACT SPECIFICATIONS STATION SAND KEY FUEL DISPENSERS

AT



UNITED STATES COAST GUARD

Station Sand Key, Clearwater, FL



PROJECT NUMBER 31562475

February 2026





SUMMARY OF WORK PART 1 GENERAL GENERAL DESCRIPTION

General Work Requirements



1. PROJECT OVERVIEW

The Contractor shall provide all labor, supervision, materials, equipment, tools, testing, permits,

and incidentals necessary to perform a complete overhaul, rehabilitation, and modernization of the

fuel storage and dispensing system at USCG Station Sand Key.



The objective is to restore the fuel system to full operational status in compliance with: Federal,

State of Florida, and Pinellas County regulations

EPA Underground Storage Tank (UST) requirements FDEP storage tank system regulations

NFPA 30 & NFPA 30A



UFC (Unified Facilities Criteria)



USCG Civil Engineering Unit standards Shape

2. EXISTING SYSTEM DESCRIPTION

The existing system generally consists of:



Diesel fuel storage tank(s) (UST or AST – verify field conditions) Fuel transfer pump(s)

Dispensing station(s)



Fuel piping (underground and/or aboveground) Leak detection system

Tank monitoring and alarm system



Spill containment and overfill prevention Electrical controls and emergency shutoff

The Contractor shall verify all existing conditions prior to mobilization. Shape

3. SCOPE OF SERVICES





3.1 Pre-Construction Services



Conduct site investigation and system condition assessment Perform tank tightness testing (if

required)

Provide as-built verification



Develop phased construction plan to minimize operational disruption Prepare and submit shop

drawings and submittals

Obtain required permits and approvals Shape

3.2 Fuel Tank Work Contractor shall:

Decommission and remove existing fuel storage tank(s), OR Clean, inspect, and rehabilitate tank (if

tank is to remain)

If replacing:

Furnish and install new double-wall UL-listed steel or fiberglass tank Provide corrosion protection

system (if UST)

Install anchoring system (if required by water table conditions)



Install new spill bucket and overfill protection Shape

3.3 Fuel Piping Replacement Remove existing underground piping

Install new double-wall fiberglass or coated steel piping Provide secondary containment

Install flex connectors at tank and dispenser Pressure test piping per code

Provide tracer wire (if non-metallic piping) Shape

3.4 Pump & Dispenser Replacement Remove and replace fuel transfer pumps

Install explosion-proof motors (Class I, Division 1 rated) Install new fuel dispensers with:

Metering system



Hose reels (if required) Automatic shutoff nozzles

Calibrate meters to weights and measures standards Shape

3.5 Electrical & Controls



Replace or upgrade control panels Install new emergency shutoff switches

Install new fuel management system (if required) Upgrade conduit and wiring to NEC compliance

Install grounding and bonding system



Integrate leak detection monitoring Shape

3.6 Environmental & Compliance

Provide soil sampling if excavation required Properly dispose of contaminated materials Provide

certified tank cleaning

Maintain spill prevention measures Provide SPCC compliance updates

Submit closure documentation (if tank removal occurs) Shape

3.7 Concrete & Site Restoration



Demolish and replace damaged concrete pads Install new equipment pads

Restore pavement and striping Restore landscaping as required Shape

3.8 Testing & Commissioning Contractor shall perform: Hydrostatic tank testing Piping pressure

testing

Leak detection system testing Electrical system testing Dispenser calibration

Full operational functional testing Provide written test reports.

Shape



4. DELIVERABLES





Contractor shall provide:



Shop drawings



Product data submittals



As-built drawings (hard copy & digital) O&M manuals

Warranty documentation (minimum 1-year workmanship, 10-year tank warranty typical) Training for

USCG personnel

Shape



5. PHASING & OPERATIONS





Maintain station fueling capability throughout project OR Provide temporary fuel supply solution

Coordinate shutdowns with Commanding Officer Restrict work to approved hours

Maintain site security per USCG requirements Shape

6. SAFETY REQUIREMENTS



Contractor shall:



Submit Site-Specific Safety Plan



Comply with OSHA 29 CFR 1910 & 1926



Provide confined space procedures (if tank entry required) Implement Hot Work Permits

Maintain fire watch during welding Follow USCG base access requirements Shape



7. QUALITY CONTROL





Contractor shall implement a Quality Control Plan Provide qualified fuel system technicians

Use licensed storage tank contractor (State of Florida certified) Maintain daily quality control

reports

Shape

8. WARRANTY



Minimum 1-year labor warranty



Manufacturer tank warranty (10–30 years depending on system) Pump and dispenser warranty per

manufacturer

Shape



9. ESTIMATED PROJECT DURATION





Design & Submittals: 30–60 days Procurement: 45–90 days

Construction: 60–120 days



Testing & Commissioning: 1–2 weeks



Total Estimated Duration: 4–8 months (depending on scope and environmental findings) Shape

10. OPTIONAL ADD ALTERNATES





Fuel polishing system Generator backup power Automated fuel tracking system Additional storage

capacity Secondary containment canopy

Cathodic protection monitoring system Shape



END OF SCOPE OF WORK





Site visit: It is highly recommended and encouraged that interested party’s contact Mr. James Pinto

for a site visit which will be held on Friday Febuary 27, 2026 at 09:00AM EST. For scheduling

contact Mr. Pinto via email James.E.Pinto@uscg.mil Or via phone at (727) 596-8666 X 105.





Performance Period: Performance of work is expected to commence NLT 10 days after award is made.

Extension period must be approved by the Contracting Officer for any unforeseen delays.

**All Questions and Answers will not be accepted after 04 Mar 2026 at 10:00AM EST. APPLICABLE FAR

CLAUSES

FAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other

Than Commercial Items).





ATTACHED BY REFERENCE

52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS

52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984)

52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984)

52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995)

Work hours: Monday through Friday, 0730 – 1800 (7:30 am – 6 pm) No weekends or Holidays authorized.



See attached applicable FAR Clauses by reference.



Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far

The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this

solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006);

Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR

clauses may be obtained electronically at http://www.dhs.gov.



Vendors providing an offer must be registered in SAM (System for Award Management)

prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors

SAM registration must be in an “ACTIVE” status prior to award.






Attachments/Links
Contact Information View Changes
Contracting Office Address
  • 100 MACARTHER CAUSEWAY MIAMI FL 33139
  • MIAMI , FL 33132
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Feb 23, 2026[Combined Synopsis/Solicitation (Original)] USCG STA Sand Key Repair Fuel Dispensers
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow P683 Aircraft Engine Repair Facility, NAS Jacksonville, FL Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 6/09/2026

Title Real-Time Six-Channel Fluorescent Quantitative PCR System for 96-Well Plates Solicitation Type SS

City of Jacksonville

Bid Due: 6/12/2026

Project ID: Y26-750 Title: Corrections BRC Security Controls and Building E Secure Door

Orange County

Bid Due: 6/30/2026

Bid Information Type Single Source Status Issued Number SS260276KCW (McCourt Composting Equipment Parts

Lee County

Bid Due: 6/22/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.