| Location: | Georgia |
|---|---|
| Posted: | Jan 6, 2025 |
| Due: | Jan 30, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-72650-NONST-2025-000000023 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-72650-NONST-2025-000000023 | CONSTRUCTION MANAGER AT RISK (CMAR) FOR SHOAL CREEK WASTEWATER POLLUTION CONTROL PLANT (WPCP) EXPANS | Griffin , City Of |
Dec 23, 2024 @ 03:15 PM
|
Jan 30, 2025 @ 02:00 PM
|
Start Date: Dec 23, 2024 @ 03:15 PM ET
End Date:
Jan 30, 2025 @ 02:00 PM ET
The City of Griffin (hereafter referred to as Owner orThe City) is requesting a Proposal from firms (hereafter Firm or Firms) interested in providing Construction Manager at Risk (CMAR) Services, including preconstruction and construction, for a plant expansion at the Shoal Creek Water Pollution Control Plant (WPCP). The WPCP expansion will upgrade the plant from a 2.25 MGD plant sending effluent to the Blanton Mill Land Application System (LAS) to a 3.0 MGD plant discharging effluent to the nearby Shoal Creek. Additional components of the WPCP will be constructed as budget allows to prepare the plant for an upgrade to 5.0 MGD in the future. The WPCP expansion may include upgrades to influent screens, influent pump station, grit removal, biological treatment process, tertiary disk filters, UV disinfection, cascade aerator, creek discharge, aerobic digesters, biosolids dewatering press, operations building, as well as associated piping, appurtenances, sites work, and demolition.
The City will select one (1) Firm with experience delivering wastewater treatment plant construction via the CMAR model to participate in the design process and construct the project.
This project may be funded in whole or in part by the Georgia Clean Water State Revolving Fund (CWSRF), or the Water Infrastructure Finance and Innovation Act (WIFIA). All associated federal funding requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM) and may not be debarred from doing business with the federal government. Respondents on this work will be required to comply with all applicable federal regulations.
The Engineer is currently 60% complete with the WPCP expansion design. The CMAR will work closely with the Engineer in reviewing the design, establishing pricing, and offering value engineering suggestions as the design process continues.
The intent is that project costs will be evaluated
| Code | Description |
| 92596 | Waste Water Treatment Engineering |
| 95826 | Construction Management Services |
| 91359 | Construction and Upgrades, Wastewater Treatment Plant |
| 91391 | Maintenance and Repair, Wastewater Treatment Plant |
Suzanne Partin
lpartin@cityofgriffin.com
470-497-3452

With GovernmentContracts, you can:
...) 89095 Recycled Water Supply, Groundwater and Sewage Treatment Equipment, Including Parts... Pure ...
State Government of Georgia
Bid Due: 6/08/2026
...Treatment Plant 92596 Waste Water Treatment Engineering 96895 Wastewater Treatment Plant, Operations... RFPQ ...
State Government of Georgia
Bid Due: 6/09/2026
...Sewage Collection, Treatment, and Disposal Engineering 92596 Waste Water Treatment Engineering 92597... Water ...
State Government of Georgia
Bid Due: 7/16/2026
...Collection, Treatment, and Disposal Engineering 92596 Waste Water Treatment Engineering BuyerContact: Ashley Love ...
State Government of Georgia
Bid Due: 7/06/2026