AZ BL COLO 7528(1) Burro Creek Road

Location: Arizona
Posted: Nov 12, 2026
Due: Nov 17, 2026
Agency: TRANSPORTATION, DEPARTMENT OF
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: 6982AF27B000002
Publication URL: To access bid details, please log in.
Follow
AZ BL COLO 7528(1) Burro Creek Road
Active
Contract Opportunity
Notice ID
6982AF27B000002
Related Notice
6982AF27B000002
Department/Ind. Agency
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Nov 12, 2026 04:20 pm MST
  • Original Published Date: Oct 15, 2026 01:09 pm MDT
  • Updated Date Offers Due: Nov 17, 2026 02:00 pm MST
  • Original Date Offers Due: Nov 17, 2026 02:00 pm MST
  • Inactive Policy: Manual
  • Updated Inactive Date: Dec 17, 2026
  • Original Inactive Date: Dec 17, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Kingman , AZ 86401
    USA
Description

PROJECT DESCRIPTION:



Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.



SCOPE OF THE WORK:



The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:




  • Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.

  • Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.

  • Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns

  • Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.



The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.



PRINCIPAL WORK ITEMS:



Roadway Aggregate: 1,600 TONS



Ditch Reconditioning: 2,000 LNFT



Full Depth Reclamation: 1.3 MILE



Asphalt Concrete Pavement: 3,600 TON



18-Inch Pipe Culvert: 100 LNFT



24-Inch Pipe Culvert: 175 LNFT



Boulder: 100 EACH



ANTICIPATED SCHEDULE:



Advertisement – October 2026



Award-January - 2027



Construction – January 2027 through October 2027



ESTIMATED COST RANGE:



Between $2,000,000 and $5,000,000


Attachments/Links
Contact Information
Contracting Office Address
  • 12300 W. DAKOTA AVE
  • LAKEWOOD , CO 80228
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Sep 15, 2026[Presolicitation (Original)] AZ BL COLO 7528(1) Burro Creek Road
Oct 15, 2026[Solicitation (Updated)] AZ BL COLO 7528(1) Burro Creek Road
Oct 27, 2026[Solicitation (Updated)] AZ BL COLO 7528(1) Burro Creek Road
Nov 5, 2026[Solicitation (Updated)] AZ BL COLO 7528(1) Burro Creek Road
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Project: HOME- Roof, Electric, Bathroom, Kitchen- McNeal Ref. #: 27-03-DEV-01 Type: ITB Status:

Cochise County

Bid Due: 12/10/2026

DOWNLOAD TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT Date: November 24, 2026, at

Navajo Tribal Utility Authority

Bid Due: 11/24/2026

Project ID: Title: Employee Benefits- Life/STD/FSA/HSA/COBRA Addenda: 0 Release Date: 10/20/2026 Due Date:

Tempe Union High School District

Bid Due: 11/19/2026

Pavement Marking (2027-2028) Department: Public Works Category: Yuma County RFP's RFP Number: 2027-2028CY.05

Yuma County

Bid Due: 11/24/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.