| Location: | Virginia |
|---|---|
| Posted: | Jun 4, 2025 |
| Due: | Jun 26, 2025 |
| Agency: | State Government of Virginia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 95241-3 |
| Publication URL: | To access bid details, please log in. |
Rapidan Service Authority -1033 Fishback Road, Madison, VA 22727
Closing On: 6/26/25 2:00 PM
Time Left: 21 days
The project entails upgrading and expanding the Madison WWTP from 80,000 to 160,000 gpd. The major elements of work to be performed include: New influent fine screening system with manual screening chamber; new influent flow measurement flume, new influent pump station, new SBR treatment system to include pre-cast post-tensioned tank system (Pre-EQ, SBR 1, SBR2, Aerobic Sludge Holding 1 and 2 tanks), new SBR and aerobic sludge holding blower system, new chemical feed and storage systems, new UV disinfection system; new effluent pump station with post aeration; new sludge dewatering system and new building; new electrical building/gear/system; new generator with 1,250 gallon belly tank; new ATS, new SCADA system for all new processes/equipment, a new control building and all required ancillary components required to provide a complete and functional system.A mandatory pre-bid conference was held at the project site on May 27th, 2025 at 10:30 AM.
IFB Construction
View Opportunity
Add to Favorites
With GovernmentContracts, you can: