All work is pursuant to the requirements of M.G.L c. 30,39

Location: Massachusetts
Posted: Jan 16, 2026
Due: Feb 5, 2026
Agency: Commonwealth of Massachusetts
Type of Government: State & Local
Category:
  • 71 - Furniture
Solicitation No: BD-25-1147-COE01-COE01-124481
Publication URL: To access bid details, please log in.
Header Information
Bid Number:
BD-25-1147-COE01-COE01-124481
Description:
All work is pursuant to the requirements of M.G.L c. 30,39
Bid Opening Date:
02/05/2026 02:00:00 PM
Purchaser:
Kiara Freeman
Organization:
City of Everett
Department:
COE01 - PURCHASING
Location:
COE01 - PURCHASING
Fiscal Year:
25
Type Code: Allow Electronic Quote:
Yes

Alternate Id:

Required Date:
Available Date
:
01/16/2026 01:17:52 PM
Info Contact:
Kiara Freeman, 617-394-2288; kiara.freeman@ci.everett.ma.us
Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
refer to manual
Bulletin Desc:
The work includes furnishing all labor, materials, and equipment to demolish and remove the existing playground and site features, implement and maintain erosion and sediment controls, obtain required permits, and complete all necessary site preparation, grading, and drainage/utility work for the proposed improvements.
Ship-to Address:
Kiara Freeman
City of Everett
Attn: Purchasing - Room 14
Everett, MA 02149
US
Email: kiara.freeman@ci.everett.ma.us
Phone: (617) 394-2288
Bill-to Address:
Kiara Freeman
City of Everett
Attn: Purchasing - Room 14
Everett, MA 02149
US
Email: kiara.freeman@ci.everett.ma.us
Phone: (617) 394-2288
Print Format:
Bid Print
Required Quote Attachments
Item Information

Item # 1:

(

72-13

-
00

)



The City of Everett is interesting in bids for the Corporal Arthur Nelson Play Lot Renovation Project (referred to as Fuller Street Park, is located in Everett, MA. The work includes furnishing all labor, materials, and equipment to demolish and remove the existing playground and site features, implement and maintain erosion and sediment controls, obtain required permits, and complete all necessary site preparation, grading, and drainage/utility work for the proposed improvements. New construction includes a bituminous concrete half-court basketball court, a new splash pad with associated equipment and utilities, and new playground equipment (including swings) with required PIP safety surfacing. Additional improvements include new ADA-accessible concrete walkways, site perimeter modular block wall, fencing and gates, and all related appurtenances, including site furnishings (tables, benches, bike racks), a shade shelter, a new flagpole and park signage, and new landscaping and plantings.

U N S P S C Code:
72-13-00
General building construction

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Conference: The Department of Youth Services (DYS or the Department') will not be ...

Commonwealth of Massachusetts

Bid Due: 5/11/2027

...Method: Open Market Pre Bid Conference: Bulletin Desc: Green Communities Competitive Grants... Print ...

Commonwealth of Massachusetts

Bid Due: 6/11/2026

...Conference: Not applicable Bulletin Desc: The Executive Office of Public Safety and Security, ...

Commonwealth of Massachusetts

Bid Due: 11/24/2032

...Market Pre Bid Conference: Bulletin Desc: The Massachusetts Department of Youth Services seeks ...

Commonwealth of Massachusetts

Bid Due: 3/06/2030

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.