| Location: | South Carolina |
|---|---|
| Posted: | Aug 19, 2025 |
| Due: | Sep 18, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RIA SCIIP Grant: A-23-C143/R-23-C143 |
| Publication URL: | To access bid details, please log in. |
Construction of stormwater collection and conveyance infrastructure. The work to be performed generally consists of the installation of reinforced concrete piping and associated drainage structures, and associated appurtenant work such as utility relocation, paving, and site restoration. Also, a stormwater pocket park with retention pond to be constructed.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Delivery Method: Design-Bid-Build Agency Project Coordinator: BLAKE BARBARE Email: BLAKE.BARBARE... of an engineering ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/17/2026
...of a conceptual design for the replacement new Miriam Brown Community Center. Full ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/06/2026
...School District One Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator... term Indefinite ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026