FECON BULL HOG HIGH FLOW FORESTRY MULCHER
| Location: |
New York |
| Posted: |
Jul 1, 2025 |
| Due: |
Jul 8, 2025 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- 38 - Construction, Mining, Excavating, and Highway Mainenance Equipment
|
| Solicitation No: |
W911S225U1052 |
| Publication URL: |
To access bid details, please log in. |
FECON BULL HOG HIGH FLOW FORESTRY MULCHER
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
MISSION INSTALLATION CONTRACTING COMMAND
Sub Command 3
419TH CSB
Office
W6QM MICC-FT DRUM
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
-
Original Published Date: Jul 01, 2025 02:04 pm EDT
-
Original Date Offers Due: Jul 08, 2025 04:00 pm EDT
-
Inactive Policy: Manual
-
Original Inactive Date:
Jul 01, 2026
-
Initiative:
Classification
Description
1. Fecon BH74SS-FUS Fusion Model Bull Hog High Flow Forestry Mulcher-Compatible with ASV RT135F2. With FGT Rotor3. Flow Range 30- 50 GPM4. Unit must have a minimum weight of 2,790 lbs.5. 61? wide cutting path6. Unit must have an overall length less than or equal to 76?.7. Rear chain guard to contain mulch8. The unit must have a drum style rotor9. Rotor must operate at a maximum speed of 2000 RPM10. Rotor tip-to-tip diameter must be at least 19.7?11. Mulcher drum shall have a 1? wall thickness with forged steel tool holders welded in a staggered pattern throughout the drum12. Standard double carbide tools must be less than 3.75? tall and must fit the interface of the holder13. The unit must be available with 30 double carbide tipped cutting tools14. The rotor must have bolt-on stub shafts that must be forged and heat-treated15. The rotor must rotate on 65mm spherical roller bearings with well-sealed bearing housings16. Will accept twin maul carbide teeth for rocky terrain for fire-danger areas17. EQUIPMENT QUICK ATTACH WORK TOOL CHANGING SYSTEM18. 2. COPIES OF ALL OPERATORS, SERVICE AND PARTS MANUALS19. ONSITE FACTORY TRAINING20. PRICING TO REMAIN IN EFFECT UNTIL SEPTEMBER 30, 202521. DELIVERY DATE OF 120 DAYS AFTER RECIEPT OF ORDER22. DELIVERY TO FORT DRUM NEW YORK
Attachments/Links
Contact Information
Contracting Office Address
-
MICC FORT DRUM 4205 PO VALLEY RD
-
FORT DRUM , NY 13602-5220
-
USA
Secondary Point of Contact
History
-
Jul 01, 2025 02:04 pm EDTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...: 333517 - Machine Tool Manufacturing Place of Performance: Watervliet , NY 12189 ...
DEPT OF DEFENSE
Bid Due: 8/26/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.