| Location: | Pennsylvania |
|---|---|
| Posted: | Oct 22, 2024 |
| Due: | Nov 22, 2024 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Colebrookdale Township, Berks County |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work to be completed under this contract consists of all labor, equipment, and materials necessary to replace approximately 140 linear feet of an existing 48-inch corrugated metal storm pipe with two (2) new, 36-inch HDPE storm pipes, located on the Colebrookdale Township Building property. The Work also includes, the installation of storm sewer structures such as the pipe headwall and endwall, rip-rap apron instllation, grading improvements and restoration of all disturbed areas. The proposed improvements are to be installed in accordance with the plans dated September, 18, 2024, as prepared by Gilmore & Associates, Inc.

With GovernmentContracts, you can:
...of rip-rap to stabilize and protect the extended Wastewater Treatment Plant outfall channel...
PennBid
Bid Due: 10/15/2026
...opening modifications; concrete underpinning; stabilization using shotcrete; scour infill with rip rap...
PennBid
Bid Due: 10/15/2026
...piping, a rip rap apron, construction erosion and sediment control, grading, and site ...
PennBid
Bid Due: 10/01/2026