| Location: | Washington |
|---|---|
| Posted: | Aug 20, 2025 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of the restoration of approximately 1.2 miles of forest road on the Camp Bonneville site. Work will include sub-base repair, regrading, gravel surface placement and compaction. Also included in the work will be establishing grade reversals, culvert installation and gravel surface placement.
Addendum 1 - Issued Monday, August 4, 2025
A Non-Mandatory but highly encouraged site meeting is scheduled for Tuesday, July 29, 2025 at 9:00 am. Contractors shall meet at the front gate to Camp Bonneville located at 23201 NE Pluss Road, Vancouver WA 98682.
NOTE: Due to the site constraints, entrance to the meeting will be restricted to only one (1) representative from each contractor.

With GovernmentContracts, you can:
...of dewatering the site, providing erosion control, excavating the existing dike soil and ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/21/2026
..., excavating the existing dike soil and stockpiling, removing the 36" diameter dike ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/21/2026
...-84-Scrapers 760-90-Shovels, Power; and Excavating Machines, Telescoping and Hinged Boom Type...
State Government of Washington
Bid Due: 10/08/2026
.... 4. Furnishing and installing the upper and lower Fiber Optic Sensing Cables. ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 9/30/2026