| Location: | Texas |
|---|---|
| Posted: | Aug 20, 2025 |
| Due: | Sep 4, 2025 |
| Agency: | City of Fort Worth |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0218 |
| Publication URL: | To access bid details, please log in. |
Project Description: Preselection of the following equipment is included in Mary's Creek Water Reclamation Facility - Preselection Package 2:
1. Equalization and Peak Flow Storage Basin mixing systems (chopper pumps and mixing nozzles).
2. Coarse screens with associated sluice system and washer/compactors.
3. Grit removal equipment with associated grit washers and pumps.
4. Fine screens with associated screening conveying system.
5. Ultraviolet (UV) disinfection system.
6. Centrifuge dewatering system.
The scope of work for each Preselected Equipment Supplier (PES) will include the following:
1. Furnish equipment system as defined in the technical specifications.
2. Provide services during the design phase to develop shop drawings for equipment system and
assist the Design Engineer in developing the overall facility design.
3. Coordinate with the General Contractor during construction and startup of the equipment system.
4. Equipment system integration, start-up, and testing services.
5. Other work as prescribed in the specifications.

With GovernmentContracts, you can:
...Project: PW CSP - C01239 - Mary's Creek Water Reclamation Facility Ref. #: ...
City of Fort Worth
Bid Due: 6/25/2026
..., reclaim water, and wastewater storage facilities. This will involve multiple projects to ...
City of Austin
Bid Due: 6/22/2026
...Follow 5430-- RFI: PTW 3D Water Phantom QA Device - Sources Sought Active ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/22/2026
...Elevated Storage Tank Rehabilitation) Issue Date & Time 6/8/2026 10:25:28 AM (CT) Close ...
City of Irving
Bid Due: 6/26/2026