| Location: | Kentucky |
|---|---|
| Posted: | Nov 3, 2025 |
| Due: | Nov 24, 2025 |
| Agency: | City of Louisville, Kentucky |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB260101 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Hall Place Boulevard Connector Project consists of the construction of a new 1,100-foot roadway connecting Beulah Church Road to Cedar Creek Road. The scope of work includes, earthwork and grading, installation of curb and gutter, construction of a new stormwater drainage system, installation of new sidewalks, placement of asphalt base and surface courses. All construction activities shall be performed in accordance with the approved construction plans developed during the planning and design phase. Contractors must adhere to all specifications, standards, and requirements outlined in the project documents.

With GovernmentContracts, you can:
...; earthwork; exterior improvements; site utilities; and communications....
State Government of Kentucky
Bid Due: 12/08/2026
...; plumbing; HVAC; electrical; electronic safety and security; earthwork; exterior improvements; site utilities; ...
State Government of Kentucky
Bid Due: 12/08/2026
...for as shown on the bid schedule for Earthwork Borrow Material on a ...
State Government of Kentucky
Bid Due: 12/01/2026
..., earthwork, and related utility work; Demolition and removal services; Hoist and crane ...
DEPT OF DEFENSE
Bid Due: 9/16/2027