| Location: | Florida |
|---|---|
| Posted: | Apr 1, 2026 |
| Due: | May 4, 2026 |
| Agency: | City of DeBary |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 16-26 |
| Publication URL: | To access bid details, please log in. |
| Date | Time | Mandatory | Location |
| 3/17/2026 | 11:00 AM | Yes |
DeBary City Hall
16 Colomba Road DeBary, FL 32713 |
| Date | Time | Location |
| Question | Date Asked | Answer | Date Answered |
| What is the engineer`s estimate? | 3/2/2026 9:07:38 AM | ||
| Are the CAD files available? | 3/2/2026 9:08:21 AM | ||
| Will burning onsite be permitted for the clearing and grubbing stage of the project? | 3/17/2026 9:59:41 PM | ||
|
Question from Vendor: I had reached out about the E One system for this job the other day. I got back with the vendor and these were her concerns.
Tim, see posted below - the lift station detail they show is not an EONE station nor are the notes from an EONE spec although they call for an entire EONE system (may have just been grabbed from another project) but nonetheless want to ensure that they are ok with the drawings ive provided for the EONE package. • The most important id want to confirm is that the station has been sized considering the future expansion to the facility. I see "Future Events Building", "Future Operations Building", "Future Maintenance Building" - NOT IN CONTRACT.....shown on C4.0. The proposed station is rated for 3,000 GPD • Confirm 240V I Phase will be available to the EONE panel • EONE does not have an H20 traffic rated lid, my quote does not include the fiberglass valve box • The proposed EONE station I have quoted has a manifold inside the station with a single 1-1/4" discharge out of the basin (we can revise to a parallel discharge out of station if external valve box is required) typically a single small curb box with 1 1-1/4" EONE SS check valve (per their detail sheet in upper right of lift station page) would be utilized instead of the larger fiberglass shown |
3/19/2026 8:04:40 AM | ||
| Would it possible to extend the Questions due time till Monday, I am waiting on suppliers` info to make sure I don`t have any further questions. | 3/23/2026 1:55:06 PM |
| Code | Description |
| [912-23] | Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.) |
| [913-36] | Construction, Parking Lot and Alley |
| [913-45] | Construction, Sewer and Storm Drain |
| [958-26] | Construction Management Services |
| Publication | Date |
| Daytona News Journal | 3/1/2026 |

With GovernmentContracts, you can:
...West Mitchell Hammock Road Corridor Safety Improvements Secondary Contact Procurement Department Number...% of ...
Polk County Public Schools Facilities and Operations
Bid Due: 6/25/2026
...Title Engineering Services for Infrastucture Improvements Secondary Contact Number RFQ 2027-4300-01... Amount Performance ...
Polk County Public Schools Facilities and Operations
Bid Due: 7/02/2026
...Contact Paul Callaway Title PD&E Study for Old Canoe Creek Road Improvements (Canoe ...
Osceola County Board of County Commissioners
Bid Due: 6/16/2026
...Insurance Required No Bid Bond Required No Bid Bond Amount Performance Bond Required ...
Brevard County School Board
Bid Due: 7/15/2026