| Location: | California |
|---|---|
| Posted: | Oct 22, 2024 |
| Due: | Nov 12, 2024 |
| Agency: | City of Palo Alto |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: CITY HALL COOLING TOWER FILL MEDIA REPLACEMENT
Addenda: 1
Release Date: 10/22/2024
Due Date: 11/12/2024
Replace the fill media in the Marley NC Series Cooling Tower, located on the 8th floor of City Hall. Isolate and drain the cooling tower, remove and replace the galvanized panels, install new fill media, water nozzles, and change the gearbox oil along with replacing the pinion seals. Reconnect all systems, perform necessary maintenance, and conduct a final inspection to ensure the tower is operational and leak-free.

With GovernmentContracts, you can:
...the Torrance Refinery Water Recycling Plant (TRWRP) to the Torrance Refinery (TORC) for ...
West Basin Municipal Water District
Bid Due: 11/05/2026
...(IWT) system for designated cooling towers, boilers, thermal ice storage systems, heating &...; ...
DEPT OF DEFENSE
Bid Due: 9/28/2026
...for designated cooling towers, boilers, thermal ice storage systems, heating & cooling closed... ...
DEPT OF DEFENSE
Bid Due: 9/28/2026
...towers, boilers, thermal ice storage systems, heating & cooling closed loop water-based Heating..., ...
DEPT OF DEFENSE
Bid Due: 9/28/2026