| Location: | Massachusetts |
|---|---|
| Posted: | May 21, 2026 |
| Due: | Jun 23, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project includes the following Work:
The Project consists of the installation of a new 100 HP submersible well pump and transmitter, yard piping improvements, and abandonment and capping of Wells 2 & 3 including removal of the pump, column pipe, level element, and wellhead at the Taylor Well site in Brunswick, Maine. The Project also consists of a new control panel, removal and replacement of two variable frequency drives, two new sine wave filters, installation of 12-inch raw water flow meter and associated process piping, and pressure transmitter assembly at the Taylor Station Water Treatment Facility. Electrical site work will include demolition of existing underground power/control conduit from Taylor Station to the Taylor Well site, and new power and control conduit and wire.

With GovernmentContracts, you can:
Bid Solicitation: BD-24-1031-ADMIN-ADM08-98917 Responses Due in 3407 Days, 20 Hours, 26 Minutes Header
Commonwealth of Massachusetts
Bid Due: 6/30/2033
Bid Title: DIGITIZATION OF CITY RECORDS FOR ONLINE DATABASE INTEGRATION Category: City of
City of Methuen
Bid Due: 10/07/2026
Header Information Bid Number: BD-27-1007-1007C-1007L-133437 Description: RFR 27-105 Statewide Subject Specific Reference &
Commonwealth of Massachusetts
Bid Due: 12/18/2026
Header Information Bid Number: BD-27-1007-1007C-1007L-133433 Description: RFR 27-104 Statewide General Reference & Research
Commonwealth of Massachusetts
Bid Due: 12/18/2026