| Location: | Massachusetts |
|---|---|
| Posted: | May 21, 2026 |
| Due: | Jun 23, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project includes the following Work:
The Project consists of the installation of a new 100 HP submersible well pump and transmitter, yard piping improvements, and abandonment and capping of Wells 2 & 3 including removal of the pump, column pipe, level element, and wellhead at the Taylor Well site in Brunswick, Maine. The Project also consists of a new control panel, removal and replacement of two variable frequency drives, two new sine wave filters, installation of 12-inch raw water flow meter and associated process piping, and pressure transmitter assembly at the Taylor Station Water Treatment Facility. Electrical site work will include demolition of existing underground power/control conduit from Taylor Station to the Taylor Well site, and new power and control conduit and wire.

With GovernmentContracts, you can:
...Header Information Bid Number: BD-25-1278-DPW15-DPW1-135141 Description: PFAS Water Treatment...: PFAS Water Treatment Plant ...
Commonwealth of Massachusetts
Bid Due: 12/04/2026
...and Subcontractor prequalifications for Water Treatment Plant Bid Opening Date: 12/11/2026 05:00:00 PM ...
Commonwealth of Massachusetts
Bid Due: 12/11/2026
...-10-00 Water and wastewater treatment supply and disposal Qty Unit Cost UOM ... ...
Commonwealth of Massachusetts
Bid Due: 12/01/2028
...AND CHEMICAL TREATMENT OF GRAVEL PACKED WELLS AT BROWNa??S CROSSING WELLFIELD Bid Opening ...
Commonwealth of Massachusetts
Bid Due: 12/01/2026