The Project includes the following Work:
The Project consists of the installation of a new 100 HP submersible well pump and transmitter, yard piping improvements, and abandonment and capping of Wells 2 & 3 including removal of the pump, column pipe, level element, and wellhead at the Taylor Well site in Brunswick, Maine. The Project also consists of a new control panel, removal and replacement of two variable frequency drives, two new sine wave filters, installation of 12-inch raw water flow meter and associated process piping, and pressure transmitter assembly at the Taylor Station Water Treatment Facility. Electrical site work will include demolition of existing underground power/control conduit from Taylor Station to the Taylor Well site, and new power and control conduit and wire.

With GovernmentContracts, you can:
...UNDERGROUND UTILITIES DATA IMPROVEMENTS, DATA CONVERSION, AND DATA COLLECTION SERVICES 10/15/2026 $5,000,000...
Massachusetts Department of Transportation - Highway Division
Bid Due: 10/15/2026
...AdvertisedContract: A478 A478 UNDERGROUND UTILITIES DATA IMPROVEMENTS, DATA CONVERSION, AND DATA... EQUEST FOR ...
The Massachusetts Port Authority (Massport)
Bid Due: 10/15/2026
...ANGB, WESTFIELD, MA 01085. SCOPE: ESTABLISH A SECURE, REDUNDANT UNDERGROUND UTILITY CORRIDOR FOR...
DEPT OF DEFENSE
Bid Due: 9/29/2026
...construction of the new bulkhead. Installation of concrete walkways, underground electric utilities...
DEPT OF DEFENSE