| Location: | Massachusetts |
|---|---|
| Posted: | May 21, 2026 |
| Due: | Jun 23, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Project includes the following Work:
The Project consists of the installation of a new 100 HP submersible well pump and transmitter, yard piping improvements, and abandonment and capping of Wells 2 & 3 including removal of the pump, column pipe, level element, and wellhead at the Taylor Well site in Brunswick, Maine. The Project also consists of a new control panel, removal and replacement of two variable frequency drives, two new sine wave filters, installation of 12-inch raw water flow meter and associated process piping, and pressure transmitter assembly at the Taylor Station Water Treatment Facility. Electrical site work will include demolition of existing underground power/control conduit from Taylor Station to the Taylor Well site, and new power and control conduit and wire.

With GovernmentContracts, you can:
...Header Information Bid Number: BD-26-1585-TWR01-TWR01-133026 Description: Water Treatment... will be held at 9:00 ...
Commonwealth of Massachusetts
Bid Due: 9/29/2026
...-10-00 Water and wastewater treatment supply and disposal Qty Unit Cost UOM ... ...
Commonwealth of Massachusetts
Bid Due: 12/01/2028
...McLaughlin Organization: Department of Environmental Protection Department: BWR00 - Bureau of Water... Resources ...
Commonwealth of Massachusetts
Bid Due: 12/21/2026
...Organization: Town of Hull Department: WWTF - Waste Water Treatment Facility Location: WWTF...
Commonwealth of Massachusetts
Bid Due: 5/06/2027