| Location: | Oregon |
|---|---|
| Posted: | Apr 1, 2026 |
| Due: | |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W9127N26BA006 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The U.S. Army Corps of Engineers (USACE) Portland District (NWP) has a requirement for HVAC upgrades at the John Day Dam (JDA) Powerhouse.
JDA is approximately 109 miles east of Portland, Oregon, and 275 miles from Seattle, Washington. JDA spans two states, with Units 1–14 located in Sherman County, Oregon, and Units 15–16 in Klickitat County, Washington.
CMMC: Contractors are advised that Cybersecurity Maturity Model Certification (CMMC) Level 2 (Self) certification is required prior to obtaining the contract drawings containing CUI and prior to contract award. Solicitation documents may be restricted to only those offerors who demonstrate current CMMC Level 2 (Self) compliance. Prior to receiving solicitation documents with CUI, offerors must affirm their CMMC status to maintain eligibility; failure to meet this requirement will result in elimination from further consideration.
CMMC requirements apply to prime contractors and subcontractors throughout the supply chain at all tiers that will process, store, or transmit any FCI or CUI on contractor information systems in the performance of this DoD contract or subcontract. Prime contractors shall comply and shall require subcontractors to comply with and to flow down CMMC requirements, such that compliance will be required throughout the supply chain at all tiers with the applicable CMMC level and assessment type for each subcontract as follows:
If a subcontractor will only process, store, or transmit FCI (and not CUI) in performance of the subcontract, then a CMMC Status of Level 1 (Self) is required for the subcontractor.
If a subcontractor will process, store, or transmit CUI in performance of the subcontract, then a CMMC Status of Level 2 (Self) is the minimum requirement for the subcontractor.
Summary of Work: Work includes but is not limited to the following:
The anticipated completion date for physical construction is 1,004 calendar days after receiving the Notice to Proceed.
The solicitation will be issued as an Invitation for Bids (IFB). This acquisition will result in a single firm-fixed-price contract.
The estimated magnitude of construction is between $25M and $100M.
This procurement is unrestricted/full and open competition. The North American Industry Classification System (NAICS) code for this action is 238220; Plumbing, Heating, and Air-Conditioning Contractors with a small business size standard of $19M.
One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.
This synopsis is not a request for quotes (RFQ), proposals (RFP), or in an invitation for bids (IFB). This is a pre-solicitation notice indicating that a solicitation for a competitive acquisition for the award of one firm-fixed-price contract is intended to be issued via Contract Opportunities at SAM.gov. The tentative solicitation issuance date is June 2026. The solicitation will not be issued less than 15 days from the date of this notice. The specifications and drawings will be included with the solicitation once issued.
This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract.
Bids will be due not less than 30 days from the date the solicitation is issued. The definitive bid due date and time will be stated in the solicitation and any associated amendments that may be issued.
Contractors are responsible for checking this page for any update(s) to this notice.
Pursuant to Revolutionary Federal Acquisition Regulation (FAR) Overhaul (RFO) 4.203-1 (b), firms must be System for Award Management (SAM) registered at the time their bid is submitted. Bids from firms that have not registered or completed their online representations and certifications may be rejected. The initial registration process in SAM may take several weeks. Registration instructions may be obtained, and online registration may be accomplished, at www.SAM.gov
| Apr 22, 2026 | [Presolicitation (Updated)] John Day Dam Powerhouse HVAC Upgrades |
| Jul 1, 2026 | [Presolicitation (Updated)] John Day Dam Powerhouse HVAC Upgrades |

With GovernmentContracts, you can:
...porch, HVAC replacement, and interior demolition and remodel. Special Instructions A pre-bid meeting... ...
Deschutes County
Bid Due: 7/21/2026