| Location: | Florida |
|---|---|
| Posted: | Jun 15, 2026 |
| Due: | Jun 25, 2026 |
| Agency: | City of Sanford |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB 25/26-13 |
| Publication URL: | To access bid details, please log in. |
| Date | Time | Mandatory | Location |
| 5/13/2026 | 10:30 AM | No | City Hall, 300 N. Park Avenue, Sanford, FL 32771 Commission Chambers followed by a site visit to 1201 W Seminole Blvd. Sanford, FL 32771. |
| Date | Time | Location |
| # | Required | Group | Make | Model | Description | Quantity | Unit of Measure | Price/ Percent | Type |
| Question | Date Asked | Answer | Date Answered |
| Please revise the owner furnished equipment list per the prebid meeting discussion regarding additional panels. | 5/13/2026 2:05:45 PM | Please see addendum #3 | 5/28/2026 1:43:37 PM |
| Please verify the available work hours. | 5/13/2026 2:05:59 PM | Monday-Friday 7:00 am – 5:00 pm. | 5/18/2026 3:20:10 PM |
| Please confirm that there will be no liability on the general contractor regarding the condition of the owner furnished equipment and that all parts associated with owner furnished equipment are included with this equipment. | 5/13/2026 2:06:15 PM | Please see addendum #3 | 5/28/2026 1:43:42 PM |
| Please confirm that any and all utility fees will be paid by the city as the contractor is unable to determine these costs ahead of time. | 5/13/2026 2:06:31 PM | Please see addendum #3 | 5/28/2026 1:43:47 PM |
|
Good morning. The scales on electrical plans seem to be incorrect. Then, when scaling the structural plans, these are also scaled incorrectly. For example: the electrical room plan on sheet S-4 has a scale of 1/4" = 1`, but when using this scale and measuring the side of the building that should be 31`4", it measures around 3`. Please provide the correct scale.
Thank you. |
6/3/2026 8:22:14 AM | The graphic scale on sheet E-4 should change from 0-6’ to 0-5’. | 6/3/2026 10:26:18 AM |
|
Please confirm if Duct Banks A-A through G-G are to be new (new conduits, new concrete, new wires) or if any are existing.
Thank you. |
6/3/2026 3:56:50 PM | Everything shown shall be new. | 6/4/2026 6:52:43 AM |
|
• Sheet E-3 – Equipment Identification (GB-1 and GB-2) - Please clarify the equipment labeled GB-1 and GB-2 located adjacent to ATS-1 and ATS-2.
o Provide a description of this equipment. o Confirm the required scope of work associated with these items. |
6/11/2026 1:54:08 PM | ||
|
• Sheet E-3 – Responsibility for Furnishing Equipment - Please confirm whether the following items are owner-furnished:
a. Termination Cabinet #1 and #2 b. GB-1 and GB-2 c. Portable generator (277/480V) with docking station - If the portable generator is not owner-furnished, please provide: o Equipment specifications (make/model or basis of design) o Detailed scope of work, including installation and connections |
6/11/2026 1:54:58 PM | ||
|
• Existing 1250 kW Standby Generator - Please confirm whether any modifications are required to the existing 1250 kW stationary standby generator.
o If modifications are required, provide a detailed description of the scope. o Provide the make and model of the existing generator. |
6/11/2026 1:55:23 PM | ||
|
• Sheet E-6 – Equipment and Panel Schedules - Please provide equipment schedules, panel schedules, or additional details for the following items:
o DPQ o MCC-M2 o MCC-P1 o PP-1 o SWBD-G1 o SWBD-G2 o RAS/WAS West o RAS/WAS East o MCC-G1 o MCC-G2 |
6/11/2026 1:55:43 PM | ||
|
• Belt Filter Press #2 (Sheets E-10 and E-14)
Please confirm whether Belt Filter Press #2 is intended for future installation as indicated on Sheet E-10. o Sheet E-14 does not designate this equipment as future. |
6/11/2026 1:55:56 PM |
| Code | Description |
| [150-91] | Wall Panels, Modular, Insulated |
| [155-86] | Structures, Rooms, Panels, Enclosures, etc. (Radio Frequency Shielded) |
| [203-75] | Projection Devices and Accessories: Interactive Conferencing Boards, LCD, Pads, Panels, etc., Environmentally Certified Products |
| [855-44] | Lighting and Dimming Controls: Autotransformer Dimmers, Control Panels, Solid State Thyristor/Triac Dimmers, etc. |
| [285-79] | Switches, Parts and Accessories (Miscellaneous) |
| [207-67] | Power Supplies: Surge Protectors, Uninterruptible Power Supplies, Switches, etc. |
| [285-67] | Power Systems Switchgears and Related Accessories |
| [285-95] | Wiring Devices: Adapters, Caps, Connectors, Extension Cords, Fluorescent and HP Starters, Outlets, Plates and Covers, Plugs, Receptacles, Safety Cord Lock, Switches, Terminals, etc. (Incl. Recycled Electrical Products, Supplies) |
| [951-9] | Facilities and Other Improvements |
| [914-30] | Concrete |
| [570-46] | Post-Tensioned Type Reinforcing System (For Concrete Slabs) |
| [570-46] | Post-Tensioned Type Reinforcing System (For Concrete Slabs) |
| [913-61] | Construction, Vertical, Concrete, Pour-In-Place, Form/Place/Finish |
| [913-62] | Construction, Concrete, Pour-In-Place, Form, Place, Finish |
| [760-15] | Ditch and Trenching Machines |
| Publication | Date |

With GovernmentContracts, you can:
.... Electrical systems: Replacing disconnects and associated conduits. 18. Replacing miscellaneous... Announcement Info: ...
Miami-Dade County
Bid Due: 8/06/2026