RFQ 26-008 Fiber Optic IT Annual Contract

Location: Florida
Posted: Oct 8, 2025
Due: Oct 28, 2025
Agency: New Smyrna Beach Utilities
Type of Government: State & Local
Category:
  • 60 - Fiber Optics Materials and Components, Assemblies and Access.
Solicitation No: RFQ 26-008
Publication URL: To access bid details, please log in.
Main

Agency
City of New Smyrna Beach Utilities Commission
Status
Active
Fiscal Year
2026
Primary Contact
Lauren Wright
Title
RFQ 26-008 Fiber Optic IT Annual Contract
Secondary Contact
Maureen Lynch
Number
RFQ 26-008
Tertiary Contact
Erin Anderson
Type
Request for Quotation
Department
Procurement
Online Submissions
Yes
Project Estimate
Piggyback Solicitation
No
Insurance Required
Yes
Bid Bond Required
No
Bid Bond Amount

Performance Bond Required
No
Performance Bond Amount

Construction Bond Required
No
Construction Bond Amount

Scope of Services
PRIMARY:

Provide Unit Costs for certain fiber related maintenance, installation, connections, conduit construction and repair, and fiber testing, as listed in the quote tabulation(s) below.
This project area will fall within the NSBU’s service area (Map of Fiber System will be made available to successful contractor).
The Base Quote Tabulation – Construction Related Improvement will be comprised of scheduled system improvements to conduit, pull boxes and as otherwise listed below.
The Alternate Quote Tabulation will be fiber specific connections, testing, and other technical items.
The awarded Vendor will be issued an Open Purchase Order by the COMMISSION for work throughout the year as deemed necessary by the COMMISSION. The amount of the award shall not exceed $70,000.00. The quote award may be split between two VENDORS. The term of the award shall be one year. New Smyrna Beach Utilities reserves the right to extend this contract up to three (3) additional one (1) year periods based upon mutual agreement.
Monthly/Annual Inspection Services
Maintenance Agreement Details: NSBU Has approximately 81,500ft of fiber and Approximately 90 Pull boxes throughout our system

• Monthly Inspections – Visual Inspections

• Check for Tree & vegetation Overgrowth

• Pole Attachment Verification

• ID & Recommend of Pole transfers on new pole sets

• Pole Riser Integrity Inspection

• Verify Height of Cable Slack & Sag

• Check Handhole & Lid Integrity

• Verify Marker Posts are Standing Where Applicable

• Write up report of and visible damages and recommendations to prevent further damage
Yearly Inspection Details:

• Includes all items from Monthly Inspections

• Perform Optical Time Domain Reflectometer (OTDR) testing on all dark optical fibers to check for damages

• Inspection of FTP panels to include optical termination and housing inspection

• Inspect all Splice Cases – Aerial & Underground – to check for damage

• Report for any issues found and recommended corrections for the issues
Contractor to provide a Detailed Maintenance Pricing Rates schedule with their RFQ Submittal. This pricing schedule should cover everything from Hourly rates of Personnel & Equipment along with detailed Scheduled work rates.

Written quotations must be provided for all work identified as an issue or repairs that need to be made. UCNSB would need to approve the quotation prior to Contractor proceeding with recommended repairs.

VENDOR shall provide insurance, materials, tools, labor, equipment, and supervision to perform all work necessary to complete this scope of work.
VENDOR shall submit warranties and a committed response time in days with quote submittal.

Dates(All times are listed as EST )

Broadcast Date
10/8/2025 8:00 AM EST
Question End Date
Due Date
10/28/2025 2:30 PM EST
Bid Opening Date

Pre-Bid Meetings

Total: 0 (All times are listed as EST )
Date Time Mandatory Location
Shortlist Meeting

Total: 0 (All times are listed as EST )
Date Time Location
Documents

Total: 1
Type Name Description File Type
Request for Quotation RFQ 26-008.pdf RFQ 26-008 Fiber Optic IT Annual Contract PDF
Quote/Bid


Zones
Total: 0
Zone

Groups
Total: 0
Group
Quote/Bid Items

Total: 33
# Required Group Make Model Description Quantity Unit of Measure Price/ Percent Type
1 Replace damaged riser guard or install new riser guard 1 LS Price Service
2 Install or Replace Marker Posts 1 EA Price Service
3 Uncover hand holes or pull boxes (grass, dirt, other materials 1 EA Price Service
4 Replace Pull Boxes 1 EA Price Service
5 Install New Pull Boxes 1 EA Price Service
6 Replace Pull Box Lids 1 EA Price Service
7 Adjust grade of Pull Boxes 1 EA Price Service
8 Locate Overgrown or Missing Pull Boxes 1 EA Price Service
9 Install 2" Conduit 100 FT Price Service
10 Replace or Install Pole Mounting Hardware 1 EA Price Service
11 Maintenance of Traffic 1 LS Price Service
12 Mobilization and Demobilization 1 LS Price Service
13 Emergency Mobilization and Demobilization 1 LS Price Service
14 Install OH 72 Count Fiber as a repair 1 LF Price Service
15 Install OH 24 Count Fiber as a repair 1 LF Price Service
16 Install UG 72 Count Fiber as a repair 1 LF Price Service
17 Install UG 24 Count Fiber as a repair 1 LF Price Service
18 Alternate Quote 0 Price Service
19 Furnish and Install 72 Port Patch Panel and Splice Tray 1 EA Price Service
20 Furnish and Install 24 Port Patch Panel and Splice Tray 1 EA Price Service
21 OTDR Test Fiber upon arrival to job site 1 EA Price Service
22 Disconnect & Temporarily hang Aerial fiber 1 EA Price Service
23 Furnish and Install Slack Loops 1 EA Price Service
24 Attach 72 Count Fiber 1 EA Price Service
25 Final Fiber Cable (OTDR) Test 1 EA Price Service
26 Provide and Install Wall Mount Rack Enclosure 1 EA Price Service
27 Furnish and Install Fiber Optic Pigtails 1 EA Price Service
28 Terminate pigtails into Patch Panel 100 LS Price Service
29 Install OH 72 Count Fiber 1 LF Price Service
30 Install UG 72 Count Fiber 1 LF Price Service
31 Install Pole Mounting Hardware 1 LS Price Service
32 Monthly Inspection 11 EA Price Service
33 Annual Inspection 1 EA Price Service

Additional Quote/Bid Items Fields
Display Options Spreadsheet Section
No Display Image and Specifications Hyperlink Fields
No
Display Build Sheet File Upload Field
No Display Options File Upload Field
No
Require Build Sheet File to be Uploaded
No Require Options File to be Uploaded
No
Display Lead Time Field
No Display Standard Packaging Field
No
Delivery Date
None
Required Files to be Uploaded by the Vendor
RF Quote Documentation
Shipping
None
Terms and Conditions
See attached Terms and Conditions
Include Shipping in Price of Items
No
Display Bid Tabulation to Vendors
No
Display Vendor Submissions to Vendors
No
View Vendor Submissions while Bid Solicitation is Active
No
Allow Options File to be Updated after Due Date
No
Allow Post Due Date Submission
No
Questions & Answers

Total: 0
Question Date Asked Answer Date Answered
Commodity Codes

Total: 2
Code Description
[962-18] Cable Construction, Installation and Maintenance (Fiber Optic, Communication, Computer, etc.)
[838-29] Cable, Fiber Optic w/Interconnecting Components and Accessories (See Class 280 for Other Communications Cable
Publications

Total: 0
Publication Date
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.