| Location: | Florida |
|---|---|
| Posted: | Oct 28, 2025 |
| Due: | Nov 10, 2025 |
| Agency: | Walton County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-27 |
| Publication URL: | To access bid details, please log in. |
Project ID: 25-27
Title: Driftwood Road and Ellis Road Roadway Improvements
Addenda: 4
Release Date: 9/18/2025
Due Date: 11/10/2025
The proposed project, hereinafter referred to as the “Project” consists of the reconstruction of Driftwood Road and Ellis Road—from U.S. Highway 98 to Scenic Gulf Drive in Miramar Beach—into a one‑way paired roadway system. It includes demolition and rebuilding of the asphalt pavement into two 12‑ft travel lanes paired with an 8‑ft concrete multi‑use path. Stormwater will be managed using Type F curb and gutter coupled with an exfiltration trench. The Project also involves a comprehensive and phased maintenance of traffic plan during construction as well as extensive coordination with utility providers, including an optional bid item for potentially relocating water and sewer lines.
Contract Time: The contract duration is FOUR HUNDRED TWENTY (420) days to substantial completion with an additional THIRTY (30) days for punch list completion.

With GovernmentContracts, you can:
...Project ID: Title: Septic to Sewer and Water Main Replacement Blvd Heights (Projects ...
City of Hollywood
Bid Due: 12/09/2026
...management; energy; water; waste water; sewer; utility location/ vacuum excavation; storm drainage; DRI... ...
City of Tampa
Bid Due: 12/03/2026
...of the WWWMP and support the ongoing operation and maintenance of the City's ...
City of Hollywood
Bid Due: 11/10/2026
...and support the ongoing operation and maintenance of the City's wastewater system. The ...
City of Hollywood
Bid Due: 11/17/2026