Roof Replacement Five Buildings

Location: Tennessee
Posted: May 22, 2026
Due: Jun 12, 2026
Agency: University of Memphis
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Project MACC Issue Date Response Deadline For Questions:

Roof Replacement Five Buildings

UM Designer RFQ Upload Pkg for Roof Replacement Five Buildings

$5,261,300

5/19/26

6/12/26 – All responses must be submitted to solicitation on OSA Connect at:

https://osa-connect.formverse5.com/AUTOCENESERVER/WebApp/Login.aspx

Email

Attachment Preview

The University of Memphis
REQUEST FOR QUALIFICATIONS (RFQ)
May 19, 2026
To recommend selection of a DESIGNER to the State Building Commission for:
Roof Replacement Five Buildings
SBC number 367/007-xx-2026
State of Tennessee
The University of Memphis
Memphis, Tennessee
The University of Memphis (UM) issues this RFQ to Designers interested in providing architectural,
engineering, and consulting services for the roof replacement of five buildings on campus. Qualification
Statements in response to this RFQ shall be submitted in accordance with the requirements provided
herein. All design firms must be registered with the Office of the State Architect through their website. All
design work shall utilize SBC approved contract forms and procedures, and meet the requirements of the
State Designer’s Manual, the State High Performance Building Requirements (HPBr), and University of
Memphis Design Standards, see https://www.memphis.edu/cpd/ for more information.
NOTE: Preference is for design firms located within the Memphis/West Tennessee area.
Summary of Project and Required Designer Services:
The five buildings will include but not limited to Administration, Ray Herzog, Patterson, Ellington, and Billy
Mac Jones, as budget allows. Scope of work to include asbestos testing and abatement if required, demo
ro existing roof system to deck, new vapor barrier, new insulation, new fleece-back 60 mil white
PVC/KEE membrane system, new metal and base flashings, repairs/addition of drainage systems and
overflows as required, and standard TN 30 year warranty. Finished roof surface shall maintain a
minimum slope of 1/8” per foot to drain. This will be a Design/Bid/Build project.
Scope of services will include all phases of Design and Construction: Program Verification, Schematic
Design, Design Development, Contract Documents, Bidding, Construction Administration, and Close-
Out. All Architectural, Mechanical, Electrical, Plumbing, Structural services, cost estimating and other
needed design services as required for the MACC of the complete project shall be included in the Basic
Design Services fee. Fee will be calculated using the Standard State Formula calculated on the MACC.
After the designer of record is under contract, the University and Design team will jointly select a
environmental consultant.
Additional Information:
This project will utilize State funding that has been approved in the Governor’s FY27 Budget.
. The Designer will be retained and managed under the standard University of Memphis and State
Building Commission policies and Designer Agreement.
.The maximum allowable construction cost (MACC) is $5,261,3000.
Business arrangements and staff locations:
The University prefers a single firm as Designer with business partners and consultants that serve under
the Design firm. Firms submitting Qualification Statements as a Joint Venture will need to have a current
Tennessee business license as a Joint Venture and similar projects completed as the Joint Venture.
When providing information on the designer, consultants and staff, the address of the firms and the staff
members should reflect the physical location of the consultants and staff providing the services. Any
support staff in other locations should be clearly identified in the proposal.
Registration through the website of the Office of the State Architect and OSA Connect is required for all
projects and must be completed before expressing interest through submitting responses to Letters of
Interest (LOI) or responses to Requests for Qualifications (RFQ) for a project
Schedule of Events:
RFQ SCHEDULE OF EVENTS
The Owner may adjust this schedule as it deems necessary. The Owner will communicate any adjustment to the
Schedule of Events to all known proposers and also by a special post to the UM website under RFP - RFQ
Event
Post RFQ on UM
website and OSA
Connect
Pre Proposal Conference Call
Interested parties need to submit an email request for the
phone number at least one day before the conference call.
Time
NA
Date
5/19/2026
NA
Written Question Deadline
Send by Email to RFP Coordinator
UM Responds to Written Questions
Proposal Deadline
2:00 PM
CT
2:00 PM
CT
2:00
PM CT
6/01/2026
6/05/2026
6/12/2026
UoM Interviews (optional)
NA
NA
UoM Evaluation Complete
7/06/2026
Evaluations sent to State Architect
7/10/2026
Designer Selection Public Announcement - Executive
Subcommittee Meeting of the State Building Commission
7/20/2026
UM Roof Replacement Five Buildings Page 2 of 5
RFQ Communications:
Interested parties must direct all communications regarding this solicitation to the RFP Coordinator, who
is the official point of contact. Email is the preferred form of communication.
Mark T Longfellow
Mark T Longfellow – RFQ Coordinator
mlngfllw@memphis.edu
901-678-1732
Only the UM official written responses and communications shall be considered binding with regard
to this RFQ. Additional information will be issued as an Addendum and posted on the OSA Connect.
PDF’s of proposals shall be uploaded to OSA Connect on or before the stated deadline.
Pre-Proposal Conference Call:
NA
Submittal Deadline:
To be considered, the RFQ must be uploaded to OSA Connect by the deadline in the schedule of events.
RFQ’s submitted past the due and time will not be accepted.
Submittal Format:
The RFQ response shall be on one PDF file. Maximum number of pages shall not to exceed 50
including a one-page transmittal letter, table of contents, photos, dividers, charts, spreadsheets and
appendices. Number all pages and follow the information structure provided with clear identification of
each information section.
Transmittal letter should be marked as follows:
Qualification Statement
Roof Replacement Five Buildings
The University of Memphis
Submitted By: <<Firm Name>>
Contact: <<Contact Person Name, Address, Telephone Number>>
RFQ Evaluation
Through this RFQ, the UM seeks to obtain the most qualified design services for the project. UM
reserves the right, at its sole discretion, to request clarification of a response(s) to the RFQ.
UM Roof Replacement Five Buildings Page 3 of 5
Qualifications Statement Required Information and Scoring:
A. Design Firm Information: (Pass/Fail – If all items below are not provided, proposal will not be
opened)
A.1 Provide the firm’s name, address, phone number, firm’s website
A.2 Describe the firm’s form of business (i.e., individual, sole proprietor, corporation, non-profit
corporation, partnership, limited liability company) and provide the name, e-mail address, mailing
address and telephone number of the primary contact for the firm.
A.3 On a single page, provide a summary list of all project participants. Include the name of the
primary firm and each consultant along with their area of responsibility and the name of each staff
member to be associated with the project.
A.4 Provide a statement of whether the firm, its consultants or any individual who shall perform work
under the contract has a possible conflict of interest and, if so, the nature of that conflict.
http://www.tn.gov/finance/OSA/documents/SBCPolicyMASTER.pdf
B. Qualifications and Experience:
B.1 Describe the firm’s credentials to deliver the services needed for this project. Provide an
overview of your firm’s expertise with projects of similar type, complexity, and scope. Provide a
list of current projects on which your firm is committed, the status and what services are being
provided.
Maximum B.1: 5 points.
B.2 Provide information on up to five of the firm’s design services projects that have been completed
within the last five years and that are of similar type, scope, and complexity. Include the
following information:
• Extent of services provided
• The Designer’s and Consultants key personnel for each project
• Design time period
• Completion date and dollar value of construction
• Actual cost versus budget
• A reference (Owner representative) for each project including contact name, address,
telephone number, email address. The Owner may contact references given as well as
any other source available.
• Photographs for each project
• Describe how each project relates to the program for this project
In the event specialty consultants are included as part of the firm’s team, provide information on
up to five of the consultant’s projects that have been completed within the last five years and
that are of similar type, scope, and complexity. Include the information defined in B.2a.
Maximum B.2: 20 points)
B.3 Provide the resumes of key firm and consultant personnel who shall be assigned to this
project and describe their proposed role and time commitment to this project. Provide each
individual’s current position with the firm or consultant, years with the firm, education,
licensing, professional credentials, and similar project experience. Maximum: 15 points.
UM Roof Replacement Five Buildings Page 4 of 5
B.4 Provide a matrix showing the relationship between the projects (B.2) and the key firm and
consultant personnel (B.3). Show projects in columns and personnel in rows. Maximum:
10 points.
C. Technical Services:
C.1 Describe how the firm will approach and document the various aspects of the project: Identify
unique capabilities that your firm / team bring to this project. Provide the firm and consultant
office location(s) that will be supporting this project. If the firm and/or consultants have multiple
locations serving this project describe how personnel from each location are involved. Maximum:
10 points
C.2 Define all the services that will be included by the team. Explain how the firm will address the
various elements of the project including: programming, planning, design, architectural and
engineering services, special requirements of the project, contract documents, specifications,
software, graphics, ADA/Accessibility, cost estimating, value engineering, sustainability, etc. that
will be needed to complete this project.
In the event specialty consultants are included as part of the firm’s team, explain the specific
duties of the consultant(s) and the extent of work that may be required of the consultant(s).
Include information of various elements as identified above as appropriate.
Maximum C2: 20 points
C.3 Provide an organizational chart for this project illustrating lines of authority and specific staff
proposed for this project. The chart shall include the key personnel of the firm and basic service
consultants with their responsibility / duties identified in detail. If specialty consultant(s) will be
used, include them in the chart and a designation that they are specialty consultants. Maximum:
10 points
C.4 Describe how the firm will implement a quality assurance program to minimize the potential for
construction changes. Describe how the firm will provide an estimate of probable cost that are
reasonably accurate at each stage of the design. Describe how the firm will work with the CM/GC
to deliver a project in the budget. Provide a preliminary schedule for this project identifying the
time appropriate for each phase. Maximum: 10 points.
Total Maximum Score: 100 points
UM Roof Replacement Five Buildings Page 5 of 5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Follow United States Forest Service Jacobs Creek Job Corps Multiple Building Electrical Rehab... ...

AGRICULTURE, DEPARTMENT OF

Bid Due: 6/18/2026

...Classification Original Set Aside: Product Service Code: 6115 - GENERATORS AND GENERATOR SETS, ...

ENERGY, DEPARTMENT OF

Bid Due: 6/19/2026

...Follow United States Forest Service Jacobs Creek Job Corps Multiple Building Electrical Rehab... ...

AGRICULTURE, DEPARTMENT OF

Bid Due: 6/18/2026

...new contract OR if there is (was) an incumbent performing these services. Answer: ...

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 6/16/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.