Claystone Waste Ltd. - Request for Proposal - 2024015 Cell 9 Construction
| Location: |
Federal |
| Posted: |
Feb 28, 2025 |
| Due: |
Mar 19, 2025 |
| Agency: |
Government of Canada |
| Type of Government: |
State & Local |
| Category: |
- Y - Construction of Structures and Facilities
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
AB-2025-01673 |
| Publication URL: |
To access bid details, please log in. |
Description
Work includes:
.1 Mobilization and demobilization of equipment to site, including construction of haul
roads from the Cell 9 area to the stockpile areas, and any other haul roads required
during construction, prime contractor duties, site safety, all temporary works and
facilities necessary to complete the project, and demobilization including all
restoration of temporary facilities and disturbed areas.
.2 Stripping topsoil, subsoil, and unsuitable surface material from within the Cell 9
footprint, interior access road, surface water ditches, stockpile area (if required), and
any other area to be disturbed during construction, and hauling of material to the
appropriate stockpile area as shown on the drawings or directed by the Engineer.
.3 Excavation of Cell 9, including the construction of Cell 9 interior access road, Cell 9
embankments, berms, and stockpiling of excess material.
.4 Preparation of the subgrade layer in preparation of placement of the liner system
(including slopes).
.5 Excavation and backfill of the geosynthetics anchor trench as shown on the
construction drawings.
.6 Supply and Installation of the GCL.
.7 Supply and Installation of the geomembrane liner.
.8 Supply and installation of the drainage layer.
.9 Supply and Installation of the Cell 9 leachate collection system (including, but not
limited to, excavation of the trench and sump, supply and install of drainage
aggregate, geotextile, and piping infrastructure/accessories).
.10 Construction of the interior access road and associated surface water ditching.
.11 Topsoiling and seeding of permanent ditches, embankment slopes, all disturbed
areas, and seeding of stockpiles (as indicated on drawings) to aid in erosion control
on-site.
.12 Surveying, as required for the completion of all portions of the Work, which must
include a detailed as-built geodetic survey of the entire Work area and all the Work
performed including the base of clay liner and top of clay liner. To be provided to and
approved by Engineer as construction progresses.
Show more description
Show less description
Contract duration
The estimated contract period will be 3 month(s), with a proposed start date of 2025/04/28.
Partner with another business
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.