| Location: | Florida |
|---|---|
| Posted: | Oct 8, 2025 |
| Due: | Oct 24, 2025 |
| Agency: | Collier County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-8409 |
| Publication URL: | To access bid details, please log in. |
Project ID: 25-8409
Title: South County Water Reclamation Facility Preliminary Treatment Influent Screens Replacement
Addenda: 2
Release Date: 9/3/2025
Due Date: 10/24/2025
Sealed bids for the construction of South County Water Reclamation Facility Preliminary Treatment Screen Replacement will be received electronically until 3:00 P.M. LOCAL TIME, on the 17th day of October on the County’s on-line bidding system: https://procurement.opengov.com/portal/collier-county-fl . All bids will be publicly opened and read aloud. Any bids received after the time and date specified will not be accepted and shall be returned unopened to the Bidder. The anticipated project budget is: $3,214,000.00.
Awarded Contractor must replace existing screens with only Multi-Rake Bar Screens RakeMax-CF and replacement of compactor/washer units only with Wash and Press (WAPs), both manufactured by Huber Technologies.
In addition, replacement of four (4) motor operated channel gates and (2) manual channel gates that fully satisfy current fit, form and function. The removal and reinstallation of manual bar screen. The isolation and bypassing of flows for project work. Miscellaneous piping and piping modifications; cleaning, repair and coating of concrete channels. Replacement of existing decking and miscellaneous electrical work.

With GovernmentContracts, you can:
...discharge flume with clamshell dredging. The flume is a concrete structure, approximately 650 ...
JEA
Bid Due: 6/16/2026
...and include grading upstream and downstream of the road crossing. New 48-inch reinforced ...
County of Lake
Bid Due: 6/25/2026
...to Poinsettia Attachment 01- Submittal Form 26-704 Attachment 02 - Law Compliance Affidavit ...
County of Lake
Bid Due: 6/30/2026
...and railing service 73121805 Concrete or aggregates or stone products manufacturing services...- Testing ...
State Government of Florida
Bid Due: 10/31/2026