Request For Quotes Sanitary Sewer Lining at 2100 West 2nd Avenue
| Location: |
Indiana |
| Posted: |
Sep 30, 2026 |
| Due: |
Oct 15, 2026 |
| Agency: |
Gary Sanitary District |
| Type of Government: |
State & Local |
| Category: |
- Z - Maintenance, Repair or Alteration of Real Property
|
| Publication URL: |
To access bid details, please log in. |
Project ID:
Title: Request For Quotes Sanitary Sewer Lining at 2100 West 2nd Avenue
Addenda: 0
Release Date: 9/30/2026
Due Date: 10/15/2026
Request For Quotes Sanitary Sewer Lining at 2100 West 2nd Avenue
Request For Quotation
Engineering
67012
,
91345
,
91381
Project ID: 2026-GEN-058
Release Date: Wednesday, September 30, 2026
·
Due Date: Thursday, October 15, 2026 2:00pm
Posted
Wednesday, September 30, 2026 3:00pm
All dates & times in Central Time - Chicago
Draft Response No Bid14 days, 17 hours, 24 minutes
Post Information
Posted At:Wed, Sep 30, 2026 3:00 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview
Furnish all labor, materials, tools, equipment, superintendence, and all necessary incidentals for the repair of sanitary sewer pipe at 2100 West 2nd Avenue.
Manhole No. 2710B Sewer Invert Depth is ± 9.1 ft
Manhole No. 2710 Sewer Invert Depth is ± 10.1 ft
Manhole No. 2709 Sewer Invert Depth is ± 11.1 ft
Manhole No. 2707 Sewer Invert Depth is ± 12.5 ft
Manhole No. 2704 Sewer Invert Depth is ± 10.2 ft
Manhole No. 2705 Sewer Invert Depth is ± 8.6 ft
Manhole No. 2706 Sewer Invert Depth is ± 8.2 ft
-
CIPP line existing 12-inch diameter pipe x 1075 linear feet starting from Manhole No. 2710B to Manhole No. 2706.
-
CIPP line existing 12-inch diameter pipe x 1075 linear feet starting from Manhole No. 2710B to Manhole No. 2706.
-
The CIPP liner shall extend 4-inches into existing manholes.
-
The Contractor shall install a pre-liner or perform chemical grouting of infiltration points.
-
Pre-liner shall be continuous and extended from the starting manhole to the final manhole.
-
The minimum liner thickness shall conform to Specification 02633 and all other applicable standards for CIPP lining.
-
The minimum thickness of the cured liner must be 0.35 inches.
-
Install end seal at each end of the CIPP liner within each manhole.
-
Contractor shall CIPP line all active service laterals from the sewer main to the edge of the easement
o
r 2 feet from the outside of sewer main, whichever is greater.
-
Clean and televise (CCTV) the sewer from Manhole No. 2710B to Manhole No. 2706 prior to and upon completion of work.
Timeline
Release Project Date:
September 30, 2026
Question Submission Deadline:
October 8, 2026, 2:00pm
Proposal Submission Deadline:
October 15, 2026, 2:00pm
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.