| Location: | Alabama |
|---|---|
| Posted: | Apr 25, 2025 |
| Due: | May 21, 2025 |
| Agency: | Jefferson County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 9624103 |
| Publication URL: | To access bid details, please log in. |
| Site Address: | 3923 Clear Water Drive | |
| City: | Bessemer | |
| County: | Jefferson | |
| State/Province: | AL |
|
Online Bidding:
|
Available | |
| Closing Date: | Wed, 05/21/2025 02:00 PM CDT | |
| Project Bid Received By & Opening Information: |
Received by: Environmental Services Department, Jefferson County, Alabama, online at QuestCDN (rebranding to Hubexo on April 2, 2025)
Opening Information: Microsoft Teams virtual video conference accessed using a direct invitation link sent via email (request this link from Dan Sebusch, Hazen and Sawyer, at email dsebusch@hazenandsawyer.com) |
|
| Est. Value Notes: | Engineer’s estimate of probable construction cost is $6,100,000 to $7,630,000 | |
|
Pre-Qualification:
|
Yes
|
|
| Pre-Bid Meeting Info: | MANDATORY Pre-Bid Conference on Wednesday, May 7, 2025, at 10 a.m. Central Daylight Time via Microsoft Teams virtual video conference accessed using a direct invitation link sent via email (request this link from Dan Sebusch, Hazen and Sawyer, at email dsebusch@hazenandsawyer.com) or (audio only) by calling 470.443.0872 and entering Conference ID: 143 762 214#. |
| Project Owner Number: | E2312 | |
| Project Category Code: | Concrete Walkway, Paving - Concrete, Electrical and Controls, Electrical Equipment & Supplies, Construction, Sidewalks/Curbs/Gutters, Wastewater Treatment Plant Improvements, Electrical Installation/Construction, Fittings and Valves, Fencing/Guardrails/Handrails, Pavement Removal, Excavation, Street/Road Materials, Erosion Control - Temporary, Paving (Asphalt or Concrete), Materials, Equipment and Supplies, Plumbing, Lighting fixtures, main/replacement/installation, Lamp/Lighting Interior/Exterior, Lighting Systems, Crushed Stone/Rip Rap, Mechanical Systems, Sewer and Water Construction, Sitework/Excavating and Grading, Street/Roadway Reconstruction , Water and Wastewater Facilities, Signage, Cutting/Recycling (Concrete or Asphalt), Paving (Highway, Road or Street), Water Utilities, Instrumentation, Concrete/Formed/Flatwork/Foundation, Concrete Pavement, Sawcutting/Sidewalk/Pavement, Electrical, Removal and Replacement of pipe, Conduit/Electrical/Telemetry, Pumps or Pump stations, Buildings Modular, Meter Vault Improvements, Painting, Curbs, Water/Wastewater Infrastructure, Waterlines | |
| Description: |
Civil, mechanical (including plumbing), structural, electrical, instrumentation and control, and appurtenant work to construct a chemical storage and feed facility, construct a return activated sludge metering and control vault with associated piping at the 1st Stage Aeration Basins, replace digester heat exchangers and associated instrumentation at the Anaerobic Digesters, perform electrical work at Blower Building A and the Plant Water Pump Station, modify Flow Control Box No. 5, and replace a valve at Final Clarifier No. 10 at Valley Creek Water Reclamation Facility.
The foregoing description shall not be construed as a complete description of all work required. |
| Owner Name: | Jefferson County, AL - Environmental Serv (Hazen) | |
| Address: |
716 Richard Arrington Jr. Blvd North, Suite A 300, Birmingham, AL - 35203 |
|
| Phone: | 205-325-5496 | |
| Contact: | Tonya Kelley | |
| Email: |
kelleyt@jccal.org |
| Solicitor Name: | Hazen and Sawyer - Atlanta | |
| Design Discipline: | Soliciting agent | |
| Address: |
1300 Altmore Avenue,
Suite 520, Atlanta, GA - 30342 |
|
| Phone: | 678-244-6711 | |
| Contact: | Dan Sebusch | |
| Email: |
dsebusch@hazenandsawyer.com |

With GovernmentContracts, you can: