| Institution | UNC - Chapel Hill Academic Affairs | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://facilities.unc.edu/resources/vendor-opportunities/ | |||||
| Project Name | Electrical Distribution System (EDS) Substations and Switchgear Upgrade | |||||
| Project Manager | Stephen Moorefield | |||||
| Phone Number | ||||||
| Contact Email | stephen.moorefield@unc.edu | |||||
| Pre-proposal Date | 09/15/2026 | |||||
| Pre-proposal Time | 3:00 pm | |||||
| Pre-proposal Location | Virtual | |||||
| Closing Date | 09/29/2026 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
This project serves to enhance the University's response to unplanned electrical distribution outages amongst the three substations that supply UNC's campus. The three substations serving the campus are Cameron Avenue, Manning, and South. The planned upgrades will allow the University to restore power more quickly and improve the resiliency across campus. This project will require creating approximately 2,500 linear feet of new duct bank and primary cabling arrangements totaling approximately 16,500 linear feet, along with switchgear and smart protective relays that communicate with the Electrical Distribution Systems SCADA system. A secondary goal of this project is to replace two General Electric 15 kV Powervac Vacuum Switchgears with two Arc Flash Resistant, 15 kV, 3000 Amp continuous, and 40 kA interrupting rating Switchgears located at the Cameron Substation. These replacement switchgears shall maintain hardwiring controls integration with the Cogeneration Systems Plant and communication controls interface with the Electrical Distribution Systems SCADA system.
|
|||||
| Submit To |
Only electronic submissions will be accepted. Please submit to: UNC - Chapel Hill Stephen Moorefield, PE Project Manager Facilities Planning & Design stephen.moorefield@unc.edu
|

With GovernmentContracts, you can:
... Demolition 10B Signage 02B Deep Foundations 11A Parking Control...;Structural Steel 23A Mechanical 07A Roofing 26A Electrical 07B ... and Access ...
State Government of North Carolina
Bid Due: 11/19/2026
..., BP-23A Mechanical, BP-23B Testing & Balancing, BP-23C HVAC Controls, BP-26A Electrical &... ...
Wake County Public School System
Bid Due: 11/10/2026
..., ASPHALT SURFACE TREATMENT, DOUBLE SEAL AND TRAFFIC CONTROL NOTICE: ALL BIDDERS SHALL ...
Division of Highways
Bid Due: 11/18/2026
...air-handling unit. The work will include associated controls and electrical power connections Main...
University of North Carolina System
Bid Due: 12/03/2026