| Location: | California |
|---|---|
| Posted: | Mar 25, 2025 |
| Due: | Apr 21, 2025 |
| Agency: | Los Angeles County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BRC0000569 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | BRC0000569 | ||
| Title: | Harbor-UCLA Medical Center Replacement Program Generator Building Retrofit Project Component | ||
| Department: | Public Works | ||
| Bid Type: | Construction | Bid Amount: |
$15,000,000.00 |
| Commodity: | ELECTRICAL SERVICES | ||
| Description: |
This RFP may be downloaded at the following link: https://dpw.lacounty.gov/contracts/aed_bid/ProjectDetail.aspx?project_id=BRC0000569 The Generator Building Retrofit Project at Harbor-UCLA Medical Center involves the replacement and modernization of the existing generator switchgear and associated electrical infrastructure to ensure reliable emergency power distribution for the new Inpatient Tower (IPT) and Central Utility Plant (CUP). The project is a multi-increment, multi-phase HCAI-regulated construction effort, requiring careful shutdown coordination, phased implementation, and compliance with incremental Temporary Interim Occupancy (TIO) approvals. Scope includes, but limited to, installation of new 12kV switchgear, conduit and ductbank infrastructure, seismic upgrades, and system commissioning, with stringent requirements for continuity of hospital operations, impact mitigation, and regulatory compliance. The 12KV Switchgear and associated SEL relays and controllers as noted on the drawings are Owner Furnished-Contractor Installed. The project also includes the installation of two new fuel tanks to meet the HCAI NPC-5 requirements.
This RFP may be downloaded at the following link:
https://dpw.lacounty.gov/contracts/aed_bid/ProjectDetail.aspx?project_id=BRC0000569 The Generator Building Retrofit Project at Harbor-UCLA Medical Center involves the replacement and modernization of the existing generator switchgear and associated electrical infrastructure to ensure reliable emergency power distribution for the new Inpatient Tower (IPT) and Central Utility Plant (CUP). The project is a multi-increment, multi-phase HCAI-regulated construction effort, requiring careful shutdown coordination, phased implementation, and compliance with incremental Temporary Interim Occupancy (TIO) approvals. Scope includes, but limited to, installation of new 12kV switchgear, conduit and ductbank infrastructure, seismic upgrades, and system commissioning, with stringent requirements for continuity of hospital operations, impact mitigation, and regulatory compliance. The 12KV Switchgear and associated SEL relays and controllers as noted on the drawings are Owner Furnished-Contractor Installed. The project also includes the installation of two new fuel tanks to meet the HCAI NPC-5 requirements. |
||
| Open Day: | 2/14/2025 | Close Date: |
4/21/2025 1:00:00 PM |
| Contact Name: | Matt Jerge | Contact Phone: | (626) 476-0378 |
| Contact Email: | mjerge@dpw.lacounty.gov | ||
| Last Changed On: | 3/25/2025 8:29:26 AM |

With GovernmentContracts, you can:
...Project ID: 2026-IFB-LM-0403 Title: Playhouse Park EV Chargers Phase II Construction Project... Construction ...
City of Pasadena
Bid Due: 10/14/2026
...) 814-0968 Category Construction Bid Method Whole Item Type RFB - Request For ...
City of Los Angeles
Bid Due: 10/14/2026
...Notice to Contractors DGS: CAPSD - Construction 96800 Project ID: 4689 Release Date: ...
Sacramento County
Bid Due: 10/08/2026
...Project ID: Title: RFP 1014 Public Utilities Warehouse Construction (Re-Bid) Addenda: 0 Release... ...
City of Anaheim
Bid Due: 9/24/2026