| Location: | California |
|---|---|
| Posted: | Aug 11, 2026 |
| Due: | Aug 24, 2026 |
| Agency: | Tuolumne Utilities District |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description
The Tuolumne Utilities District (TUD) is requesting quotes for hydroseed services. In general, contractor shall place hydroseed as shown on the Erosion Control Plans in accordance with the attached specification. Water will be provided on site.
Quote Due Date:
August 24, 2026, at 2:00 PM local time.
Submission of Quotes:
Quotes shall be emailed to Gaddiel DeMattei at gdemattei@tudwater.com by the due date. Questions can also be directed to Gaddiel DeMattei at the same email or at 209-532-5536 x519
Project Documents:
Hydroseed RFQ Document
For information concerning the proposed work, contact: Mr. Gaddiel DeMattei, Senior Engineer, at (209) 532-5536, extension 519 or gdemattei@tudwater.com.

With GovernmentContracts, you can:
...RFP #26-2060-01 Consulting General Contractor Services for the Siskiyou Integrated Wellness Center Bid/RFP ...
Siskiyou County
Bid Due: 10/06/2026
...RFP #26-2060-01 Consulting General Contractor Services for the Siskiyou Integrated Wellness Center Bid/RFP ...
Siskiyou County
Bid Due: 10/13/2026
...District will, as appropriate, provide a list of prequalified general contractors and subcontractors..., ...
West Contra Costa Unified School District
Bid Due: 12/31/2026
...a construction manager (general contractor) using a two-step process: (1) this Request for ...
State Government of California
Bid Due: 10/05/2026