Addendum No. 1 for Bid Number 2025.10-Magnolia Beach Fire Station Project ? Texas General Land Office GLO CDBG-MIT-MOD Contract No. 24-065-152-F011 ? FEMA Project No. DR-4485-0067. (SEALED BID DUE BEFORE 2:00:00 PM, Tuesday, March 24, 2026)

Location: Texas
Posted: Mar 13, 2026
Due: Mar 24, 2026
Agency: County of Calhoun
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.

Addendum No. 1 for Bid Number 2025.10-Magnolia Beach Fire Station Project – Texas General Land Office GLO CDBG-MIT-MOD Contract No. 24-065-152-F011 – FEMA Project No. DR-4485-0067. (SEALED BID DUE BEFORE 2:00:00 PM, Tuesday, March 24, 2026)

Attachment Preview

A D D E N D U M N O. 1
to the
CONTRACT DOCUMENTS
FOR
MAGNOLIA BEACH FIRE STATION PROJECT
FOR
CALHOUN COUNTY, TX
873 MARGIE TEWMEY RD #1
PORT LAVACA, TEXAS
TEXAS GENERAL LAND OFFICE
GLO CDBG MIT-MOD CONTRACT NO. 24-065-152-F011
FEMA PROJECT NO. DR-4485-0067
March 12, 2026
Prepared by:
G&W Engineers, Inc.
205 West Live Oak
Port Lavaca, Texas 77979
(361) 552-4509
G & W Engineers, Inc.
Texas Registered Engineering Firm F-04188
Project No. 5310.022b
Page 1 of 4
_____________________
Scott P. Mason, P.E.
Texas Serial No. 127893
Clarifications to the original Contract Documents, Contract Drawings and/or Specifications have
been deemed necessary, and in certain cases, revisions to the original Contract Documents,
Contract Drawings and/or Specifications are required. If discrepancies and/or inconsistencies
exist between these specified revisions and the original Contract Documents, Contract Drawings
and/or Specifications, said Addendum No. 1 shall govern.
1. A pre-bid meeting was held Thursday, February 26, 2026 at 10:00 AM. The pre-bid
meeting minutes and sign-in sheet are attached hereto.
2. The attached questions from CivCastUSA.com and emailed questions with their
respective answers shall be considered final and incorporated into the Contract
Documents. As noted in the documents, it was the BIDDER responsibility to provide a
complete bid and ask any questions necessary within the questions period.
3. Certain portions of this project are tax exempt as applicable by tax laws and a certificate
can be supplied to awarded contractor.
4. Forms required with proposal as part of the bid package will be acceptable with signature
using electronic signature.
5. Submission of a bid with any clarifications, stipulations, exceptions shall not be
considered, accepted or incorporated into the contract as a condition for award, contract
or commitment to be able to perform the work.
6. The bid deadline and bid opening date shall remain unchanged.
7. The cornerstone is to procured and delivered to project by Owner. Contractor to
coordinate and/or work with Owner to conduct a “Cornerstone Placement Ceremony”.
8. ALL exterior components of the building itself are to have shop drawing and submittals
provided after award/contract which have attached the proper TDI evaluation report
paperwork included within the submittal. Failure to include the TDI evaluation report for
all items will result in an automatic rejected submittal without further review.
9. Required inspections related to the building alone and more specifically related to
windstorm shall be as outlined on the attachment to this addendum. Contractor required
to give adequate notice to Engineer to allow for scheduling of the inspection. The
Owner’s Engineer will perform Windstorm Inspections and submit all required
paperwork to the Texas Department of Insurance. Repetitive Failed inspections (more
than 1) and subsequent re-inspections shall be paid for by Contractor in the form of
retainage permanent retention in the amount of costs incurred for such inspection(s). The
Engineer will keep costs associated with repetitive failed inspections separately invoiced
from the general engineering costs and provide a detailed breakdown of manhour and
billing rates associated with the failed inspection.
CONSTRUCTION PLANS
REMOVE:
REPLACE with:
C9.2, S1.0, S1.1, A1.1, A1.2, A1.3, A1.4, A1.7, A1.8 & A1.9
C9.2, S1.0, S1.1, A1.1, A1.2, A1.3, A1.4, A1.7, A1.8 & A1.9;
Rev. 1 (All signed and sealed on 03.12.26)
Page 2 of 4
ADDENDUM NO. 1 (March 12, 2026)
Magnolia Beach Fire Station Project
Calhoun County (Job 5310.022b)
EXPLANATION:
C9.2 – Corrected Notes, Table and Detail 9.
S1.0 – Corrected dimensions and revised/added notes.
S1.1 – Corrected dimensions and added note.
A1.1 – Revised General Notes
A1.2 – Revised Door “D” note.
A1.3 – Revised Insulation Notes
A1.4 - Added note for blind requirements.
A1.7 – Modified Notes and updated call outs.
A1.8 – Modified Notes and updated call outs.
A1.9 – Updated call outs.
CONTRACT DOCUMENTS
REMOVE:
REPLACE with:
EXPLANATION:
Bid
Revised Bid
Clarifications and Additional Bid Items added to base bid as
appropriate.
TECHNICAL SPECIFICATIONS
REMOVE:
REPLACE with:
EXPLANATION:
Section 01210 – Allowances
Revised Section 01210 - Allowances
1.3 B: Added: Item 2. Contingency
And
3.3 A: Revised Items 1- 48 to: Items 1-50
REMOVE:
REPLACE with:
EXPLANATION:
Section 01340 – Shop Drawings, Product Data and Samples
Revised Section 01340 - Shop Drawings, Product Data and
Samples Allowances
General Updates and inclusion of TDI specific language.
REMOVE:
Section 01410 - Inspection, Testing and Guarantee
REPLACE with: Revised Section 01410 - Inspection, Testing and Guarantee
EXPLANATION: General Updates and inclusion of specific testing requirements.
REMOVE:
REPLACE with:
EXPLANATION:
Section 02111 – Clearing, Rough Grading, Compaction and Finish
Grading
Revised Section 02111 – Clearing, Rough Grading, Compaction and
Finish Grading
Inclusion of referenced sections for Testing.
Page 3 of 4
ADDENDUM NO. 1 (March 12, 2026)
Magnolia Beach Fire Station Project
Calhoun County (Job 5310.022b)
REMOVE:
Section 02220 - Structural Earthwork
REPLACE with: Revised Section 02220 - Structural Earthwork
EXPLANATION: Inclusions of referenced sections for Testing
REMOVE:
Section 10800 - Miscellaneous Specialties
REPLACE with: Revised Section 10800 - Miscellaneous Specialties
EXPLANATION: General Updates including plan specific updates
REMOVE:
Section 13121 - Pre-Engineered Metal Buildings
REPLACE with: Revised Section 13121 - Pre-Engineered Metal Buildings
EXPLANATION: General Updates including plan specific updates
REMOVE:
Section 15400 - Plumbing Fixtures and Equipment
REPLACE with: Revised Section 15400 - Plumbing Fixtures and Equipment
EXPLANATION: Modification of materials choice by Engineer
ADD:
Section 04248 – Brick Veneer Masonry System
EXPLANATION: Inadvertently left out of the specifications for the project.
Page 4 of 4
ADDENDUM NO. 1 (March 12, 2026)
Magnolia Beach Fire Station Project
Calhoun County (Job 5310.022b)
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...- for the Harris County Flood Control District (FEMA) Ref. #: 26/0145 Type: ...

Harris County

Bid Due: 6/15/2026

...-065-152-F011 - FEMA Project No. DR-4485-0067 (PRE-BID CONFERENCE at 10:00 AM, Thursday, June ...

County of Calhoun

Bid Due: 7/14/2026

...UPRR ROW and TXDOT ROW. The entire pipeline alignment is in the FEMA ...

City of Dallas

Bid Due: 6/05/2026

...UPRR ROW and TXDOT ROW. The entire pipeline alignment is in the FEMA ...

City of Dallas

Bid Due: 6/05/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.