| Location: | South Carolina |
|---|---|
| Posted: | May 1, 2026 |
| Due: | Jun 18, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-05-04 Cell 8 |
| Publication URL: | To access bid details, please log in. |
This Request for Bids includes providing necessary materials, labor, and equipment to construct the subgrade for the 28.2 acre MSW Cell 8 located at the Owner’s facility. The project consists of grubbing 95 acres, construction of a stormwater pond, excavation of 730,000 cubic yards of soil to be stockpiled on site or used as structural fill (for the stormwater pond, Cell 8 or the access road), grading/stone for an access road to Cell 8, and widening the existing access road.

With GovernmentContracts, you can:
...Date/Time 5400019471 SOIL INJECTION HERBICIDE APPL.-CHERAW SP Parks, Recreation & Tourism Columbia.../28/2020 02:33:00 ...
State Government of South Carolina
Bid Due: 4/20/2099
...); employing methods to reduce soil disturbance/loss; and extensive landscape restoration including...
AGRICULTURE, DEPARTMENT OF
Bid Due: 7/31/2026