| Location: | Kentucky |
|---|---|
| Posted: | Jun 23, 2026 |
| Due: | Jul 1, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912QR26RATCT |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (Single Phase Evaluation Board – RFP) for the FCKY Air Traffic Control Tower (ATCT), located in Fort Campbell, KY. Construct a standard Design Flight Control Tower. The Primary Facility (Air Traffic/Flight Control Tower) includes spaces on the first floor and throughout the functional vertical shaft space for equipment maintenance, open and closed administrative offices, administrative support spaces, passenger elevator, a server room, storage, bathrooms with showers, locker rooms, training and conference rooms, a ready room, janitors’
closets, break room, control tower cab, Army Radar Approach Control functional space, mechanical, electrical and equipment rooms. Project includes special foundations, backup power generation and an uninterruptable power supply. Fire Life Safety (FLS) systems, Building Control Systems (BCS), and Electronic Security Systems (ESS) are included. Energy Monitoring and Control Systems (EMCS) connection will be provided if applicable. Access for individuals with disabilities will be provided up to the tenth floor. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided and costs are included in the building unit cost. Fort Campbell has designated this facility as a critical asset and requested additional antiterrorism measures over the minimum required by UFC 4-010-01 be included. The cost for the additional measures is included in the Building Antiterrorism Measures line item. Supporting facilities include paving, walks, parking, lighting, and site improvements. Comprehensive interior design and furnishings are required. Heating and air conditioning will be provided by a self-contained system. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy.
| Jun 16, 2026 | [Presolicitation (Original)] FTC Air Traffic Control Tower |

With GovernmentContracts, you can:
...Project: ITB HVAC AND BOILER REPLACEMENT AT TARC TRANSPORTATION AND OPERATIONS FACILITY Ref... ...
The Transit Authority of River City
Bid Due: 7/24/2026