IFB# 2026-012
Date: December 1, 2025
RE-BID EXTERIOR BUILDING PAINTING
AND STAIR REPLACEMENT AT
COOPER RIVER MARINA
COUNTY PARK
1010 Tidewater Road
North Charleston, South Carolina
CHARLESTON COUNTY PARK
& RECREATION COMMISSION
Contents
GENERAL DESCRIPTION:............................................................................................................................ 6
SCOPE OF WORK:...................................................................................................................................... 6
PROJECT TIME OF COMPLETION............................................................................................................... 8
BID OPENING INFORMATION:................................................................................................................... 8
WRITTEN QUESTIONS DEADLINE: ............................................................................................................. 9
NON-MANDATORY PRE-BID MEETING: ................................................................................................... 9
BONDS....................................................................................................................................................... 9
INSTRUCTION TO BIDDERS........................................................................................................................ 9
ARTICLE I. - DEFINITIONS....................................................................................................................... 9
ARTICLE II – GENERAL CONDITIONS.................................................................................................... 10
ARTICLE III - BIDDER'S REPRESENTATIVE............................................................................................. 16
ARTICLE IV - BIDDING DOCUMENTS.................................................................................................... 17
ARTICLE V - BIDDING PROCEDURES .................................................................................................... 18
ARTICLE VI - OPENING OF BIDS ........................................................................................................... 20
ARTICLE VII - CONTRACTOR'S QUALIFICATION STATEMENT .............................................................. 21
ARTICLE VIII- PERFORMANCE BOND AND PAYMENT BOND ............................................................... 22
ARTICLE IX – FORM OF AGREEMENT BETWEEN CCPRC AND BIDDER................................................. 22
ARTICLE X – INSURANCE REQUIRMENTS ............................................................................................ 22
ARTICLE XI – W-9 TAXPAYER IDENTIFICATION NUMBER AND CERTIFICATION FORM........................ 22
Separate Documents
Attachment #1 – REQUIRED FORMS
Equal Employment Opportunity Certification
Non-Collusion Oath
Drug-Free Work-place Certification
Compliance with Illegal Immigrant Act
Insurance Requirement
W-9 Request for Taxpayer Identification Number and Certificate
Subcontractor Data Form
General Contractor Modified Technical Qualification Requirements
Attachment #2 – Sherwin Williams Specification
Attachment #3 – Uniflex-Acrylic-Coating-System-for-Structural-Metal-Roofing
Attachment #4 - Uniflex-Silicone-Coating-System-for-Modified-Bitumen
Attachment #5 – Uniflex Capabilities_Brochure
SAMPLE CONTRACT DOCUMENT IS A SEPARATE DOCUMENT
1
RE-BID EXTERIOR BUILDING PAINTING & EXTERIOR STAIR REPLACEMENT
AT CRM
2026-012
BID PRICE FORM
DATE
TO: CHARLESTON COUNTY PARK AND
RECREATION COMMISSION (CCPRC)
861 RIVERLAND DRIVE
CHARLESTON, SC 29412
RE: INVITATION FOR BID
RE-BID EXTERIOR BUILDING PAINTING & STAIR REPLACEMENT
AT COOPER RIVER MARINA (CRM)
1010 TIDEWATER ROAD
North CHARLESTON SC 29405
IFB No. 2026-012
FROM:
(Bidder)
(Address)
EMAIL ADDRESS/PHONE NUMBER
The Undersigned, having carefully examined drawings, project details, specifications, and other
documents insert for EXTERIOR BUILDING PAINTING & STAIR REPLACEMENT, at CRCP, IFB No.
2026-008 dated________________, and the following addenda:
Addendum No. _____ Dated ____ Addendum No. _____ Dated _______
Addendum No. _____ Dated ____ Addendum No. _____ Dated _______
Addendum No. _____ Dated ____ Addendum No. _____ Dated _______
As well as the premises and conditions affecting the work, proposes to furnish all labor,
materials and equipment called for by them for the entire work in accordance with said
documents.
By submittal of this bid, the bidding Contractor certifies they have verified measurements and
are familiar with the facilities prior to submitting a bid. The project includes any required
2
RE-BID EXTERIOR BUILDING PAINTING & EXTERIOR STAIR REPLACEMENT
AT CRM
2026-012
permitting, complying with all state, federal, county and local codes, regulations and standards
in construction of the project, especially in regard to the American with Disabilities Act,
International Building codes, Local Codes, Manufacturing Recommendations and Life Safety
Codes reasonably required to complete the Scope of Work and meet the intent of the IFB.
The Scope of Work listed under Item 1- Base Bid and extended under each subsequent Item
description assumes to include all labor, permits, material, equipment and inclusive services
required to complete the project.
Item 1: BASE BID - All work shall meet or exceed the specifications listed on the included plans
and meet the most current ADA regulations. All services, labor, materials and equipment called
for in accordance with said documents for the lump sum of
Total Base Bid:
$________________
BID ADD ALTERNATE
ITEM 2: ALTERNATE NO. 1: Remove and dispose of window behind the exterior staircase and
interior cabinets that are below the window. Enlarge and frame out opening and install fixed,
double windows with aluminum framing and general dimensions of 5’ h x 6’ w. Window frame
and glass needs to meet all existing codes. A new primed steel lintel shall be installed for
window opening. Windows should be Low-E, storm rated and suitable for marine
environments. Framing should allow for window to be recessed in interior wall with 11 ¼”
window stool. The section of wall under new window should be drywalled and painted to
match existing interior walls including baseboard and quarter round wood trim. Contractor shall
provide CCPRC with cut sheets or design specifications for approval prior to installation.
Alternate Bid:
$__________________
Item 2 – Bid Alternates shall be awarded based on prices and availability of funds
TOTAL ITEMS 1 & 2
$__________________
Apparent lowest responsible and responsive price offer shall be determined by the total of items 1 & 2.
CCPRC may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic
requirement. An offer is unbalanced when it is based on prices significantly less than cost for some work
and prices which are significantly overstated for other work.
The undersigned has checked the plan(s), specifications, and the above figures and understands that he
shall be responsible for any errors or omissions in effecting coverage based on these specifications as
submitted on the Offer Form.
It is understood and agreed that the Charleston County Park and Recreation Commission reserves the
right to accept or reject any or all Offers and to waive informality in any Offer received.
The undersigned declares that this Offer is made without any connection with any person making
another Offer for the same contract, that the Offer is in all respects fair and without collusion or fraud,
that no member of the Charleston County Park and Recreation Commission or other officer of said Park
3
RE-BID EXTERIOR BUILDING PAINTING & EXTERIOR STAIR REPLACEMENT
AT CRM
2026-012
District, or any person in the employ of said Park District is directly or indirectly interested in this Offer,
or in any portion of the profits thereof.
The price specified shall include all taxes and duties of any kind levied by federal, state, municipal, or other
governmental authority, which either party is required to pay with respect to the materials or services
covered by this Agreement. At a minimum, invoices shall contain the identity of the provider of the
services, the date of the services, a description of the services (schedule of values), and any applicable taxes.
If the letter of authorization accompanying these terms and conditions allows the payment of
"reimbursables", they shall be paid at Contractor's actual cost and subject to audit by CCPRC.
Any unit prices, if accepted in the award of this contract, shall be used in establishing adjustment of
Contract Price by additions to or deductions from work in accordance with applicable requirements
specified in the General Conditions. Unit Prices listed shall include all costs, profit and overhead, and no
further surcharges are to be added to any unit price item of work that may be ordered done.
Bid Holding Time: The Undersigned hereby agrees that this bid may not be revoked or withdrawn after
time set for opening of bids but shall remain open for acceptance for a period of SIXTY (60) days
following such time.
Contractor’s Certification/Technical Qualification Requirements: The Bidders shall submit a properly
executed Contractor's Certification/Qualification Questionnaire and any other information requested
by Owner to evaluate Bidder's responsibility.
Contract Acceptance: In case the Undersigned be notified in writing by mail, email or delivery of
acceptance of this bid, he agrees to execute, within ten days from notice, a contract for the work for the
above-stated amount and at the same time to furnish and deliver to Owner a Performance Bond and a
Payment Bond, each in the amount equal to 100 percent of the contract sum.
Completion Time: The Undersigned agrees to commence actual physical work at the site, with an
adequate force and equipment, within ten calendar days from the "Notice to Proceed." Contractor has
thirty (30) days to mobilize. Substantial Completion shall be reached within one hundred twenty days
(120) days from the Notice to Proceed date.
Rain Day: For rain delays, the Contractor shall be entitled to a one-day extension of time for each day in
any given month that the actual rain days measured at the Charleston International Airport, or an
otherwise mutually agreed upon location, exceed the NOAA average monthly rainfall for the month in
Charleston, South Carolina. In order to qualify as a rain day, there must be at least one-hundredth of an
inch precipitation on the date in question. The average number of days in each month receiving one-
hundredth of an inch or more of rain in Charleston, South Carolina, according to NOAA are as follows:
Jan Feb March April May June July Aug Sept Oct Nov Dec
10 7
6
6
9
14 14 17 11 8
6
10
The rain gauge at the Charleston International Airport, or an otherwise mutually agreed upon location,
shall be used as the determinate for daily rain measurement. The Contractor shall submit any request
for rain days by the tenth day of the following month. Rain and weather delay extensions of time are
non-compensable delays and the Contractor shall be entitled to no additional compensation as
consequence of rain and weather-related extensions hereunder.
4
RE-BID EXTERIOR BUILDING PAINTING & EXTERIOR STAIR REPLACEMENT
AT CRM
2026-012
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.