| Location: | Missouri |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | Mar 26, 2026 |
| Agency: | Southwest Missouri State University |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 8458-26 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number | Posted Date | Return Date | Description | Buyer Name |
| 8458-26 | 03-11-2026 | 03-26-2026 | Dynamic Mechanical Analysis Fatigue Testing System |
| DESCRIPTION/SPECIFICATIONS | ||||||
|---|---|---|---|---|---|---|
| RFQ 8458-26 Dynamic Mechanical Analysis/Fatigue Testing System Sealed bids are hereby requested for the following item(s). General specifications and requirements are provided as part of this RFQ. When submitting sealed bid, mark in lower left corner of envelope: Sealed RFQ 8458-26. All quoted prices must be firm and fixed and must include all required components and shipping/delivery costs FOB Destination to Missouri State University in Springfield, Missouri. Where applicable, all quoted prices must be presented as Delivery Duty Paid (DDP) to include Customs Fees, Freight/Shipping, Import/Export Duties, and Taxes. Faxed or e-mail bids will NOT be accepted. | ||||||
| THE BIDDER MUST SIGN AND RETURN THIS DOCUMENT AS PART OF HIS/HER BID. Unless noted by the bidder, there shall be no restrictions on the number or quantity of an item that may be ordered. If the requested quantity is not a standard package quantity, the bidder should quote on both the requested quantity and the standard package quantity, clearly identifying each. If alternate items are offered, the bidder must provide descriptive literature and/or information for each alternate offered. Additional costs for packing, handling, etc., not shown on this quotation will not be paid by the University. See the "TERMS AND CONDITIONS OF REQUEST FOR PROPOSAL/QUOTATION (RFP/RFQ)" attached hereto for additional requirements. | DELIVERY_______DAYS ARO OR STATE EARLIEST____________________ PRICES EFFECTIVE FOR _______ DAYS OR UNTIL______________________ THE BIDDER HEREBY AGREES TO FURNISH THE ITEMS AND/OR SERVICES SPECIFIED HEREIN, AT THE PRICES QUOTED, PURSUANT TO ALL REQUIREMENTS AND SPECIFICATIONS OF THIS REQUEST FOR QUOTATION. AUTHORIZED SIGNATURE: ______________________________________ Please type or print name: _____________________________________________ TITLE____________________DATE_______________ PHONE NUMBER______________________ EMAIL ADDRESS_____________________________________________________________________ COMPANY NAME: __________________________________________________ |
| Sealed bids are hereby requested for the following item(s). |
|---|
| General specifications and requirements are provided as part of this |
| RFQ. When submitting sealed bid, mark in lower left corner of |
| envelope: Sealed RFQ 8458-26. |
REQUEST FOR QUOTATION NUMBER 8458-26
FROM: The Board of Governors of Missouri State University
Procurement Services Date:
901 South National Avenue March 11, 2026 Page 1 of 7
Springfield, Missouri 65897
Telephone: (417) 836-4414
Bid Close Date and Time:
Fax: (417) 836-6583
3:00 p.m. (CST) March 26, 2026
TO: (Provide company name and address below.)
ALL BIDS MUST BE PREPARED
TO INCLUDE FREIGHT COSTS
TO SPRINGFIELD, MISSOURI
Buyer: Tanya Smith for Missouri State University
_____________________________________________________________________________________________________________________________________________
Missouri State University, as a state supported educational institution, is exempt from the payment of sales/use taxes pursuant to RSMo 144.040 and 144.615
DESCRIPTION/SPECIFICATIONS
RFQ 8458-26 Dynamic Mechanical Analysis/Fatigue Testing
System
Sealed bids are hereby requested for the following item(s).
General specifications and requirements are provided as part of this
RFQ. When submitting sealed bid, mark in lower left corner of
envelope: Sealed RFQ 8458-26.
All quoted prices must be firm and fixed and must include all
required components and shipping/delivery costs FOB Destination
to Missouri State University in Springfield, Missouri. Where
applicable, all quoted prices must be presented as Delivery Duty
Paid (DDP) to include Customs Fees, Freight/Shipping,
Import/Export Duties, and Taxes.
Faxed or e-mail bids will NOT be accepted.
THE BIDDER MUST SIGN AND RETURN THIS DELIVERY_______DAYS ARO OR STATE EARLIEST____________________
DOCUMENT AS PART OF HIS/HER BID.
PRICES EFFECTIVE FOR _______ DAYS OR UNTIL______________________
Unless noted by the bidder, there shall be no restrictions on the
number or quantity of an item that may be ordered. THE BIDDER HEREBY AGREES TO FURNISH THE ITEMS AND/OR
SERVICES SPECIFIED HEREIN, AT THE PRICES QUOTED, PURSUANT
If the requested quantity is not a standard package quantity, the
bidder should quote on both the requested quantity and the TO ALL REQUIREMENTS AND SPECIFICATIONS OF THIS REQUEST
standard package quantity, clearly identifying each. FOR QUOTATION.
If alternate items are offered, the bidder must provide descriptive
literature and/or information for each alternate offered. AUTHORIZED SIGNATURE: ______________________________________
Additional costs for packing, handling, etc., not shown on this Please type or print name: _____________________________________________
quotation will not be paid by the University.
TITLE____________________DATE_______________ PHONE NUMBER______________________
See the "TERMS AND CONDITIONS OF REQUEST FOR
PROPOSAL/QUOTATION (RFP/RFQ)" attached hereto for EMAIL ADDRESS_____________________________________________________________________
additional requirements.
COMPANY NAME: __________________________________________________
MISSOURI STATE UNIVERSITY
RFQ 8458-26 Page 2 of 7
Specifications for DMA System:
General
1 The Jordan Valley Innovation Center seeks proposals for a servo-hydraulic fatigue testing/dynamic mechanical
analysis system capable of high-temperature cyclic and static mechanical testing of composite and ceramic materials
in accordance with:
1.1 ASTM C1341 (Flexural Properties of Continuous Fiber-Reinforced Advanced Ceramics at Elevated Temperature)
1.2 ASTM C1499 (Monotonic Equibiaxial Flexural Strength of Advanced Ceramics at Ambient Temperature)
2 System shall be configurable to support a wide range of additional ASTM standards including tension, compression,
flexural fatigue, etc. provided later acquisition of applicable fixturing and environmental solutions.
3 The system shall include all components necessary for complete system operation including load frame, control
electronics, pump, cables, plumbing and all necessary fittings and connectors. The system shall also include test
accessories with the features and capabilities described herein.
4 The components of the test system are to be new. No demonstration or used equipment will be acceptable.
Vendor Response
1 Vendor shall be willing to install the system in two or more phases if necessary to expedite delivery of the system. The
load frame and all components and accessories necessary to operate it shall be delivered as soon as manufacturing and
scheduling allow. The load unit shall include a high-temp furnace which the vendor shall agree to install during a later
appointment should the manufacturing time of the furnace significantly exceed that of the load frame.
System Load Unit
Load Frame
1 The system load frame shall be designed for static and dynamic testing and meet the following specifications:
1.1 Maximum dynamic load capacity: 25-30 kN
1.2 Dynamic load cell capacity: 2 kN
1.3 Stroke length: 50 mm
1.4 Force accuracy: 1.0% or better at 1/500 full scale
1.5 Hydraulic power unit suitable for continuous fatigue testing
1.6 Hydraulic line sets included
Load Cells
2 Dynamic load cell: 2kN
2.1 Include load cell adapter plate
2.2 Include calibration accessories if applicable
Control and Data Acquisition
3 The system shall include a digital controller and software capable of:
3.1 Load control
3.2 Displacement control
3.3 Static and dynamic test modes
3.4 User-defined waveform generation (sine, triangle, ramp, etc.)
3.5 Resonance tracking capability
3.6 Real-time data acquisition
MISSOURI STATE UNIVERSITY
RFQ 8458-26 Page 3 of 7
Hydraulic Performance Package
Hydraulic Power Unit
1 The hydraulic power unit (HPU) or pump shall supply 40 L/m. In addition, the HPU shall include pressure-control for
operating the HPU lower pressures.
2 Hydraulic power unit shall be designed to integrate with a building-wide chilled water/glycol loop for cooling.
High Temperature Capabilities
Furnace
1 Furnace shall have an operating temperature range of 1000 degrees-1200 degreesC with preference given to a system able to achieve
1200 degreesC. Ability to maintain stated temperature for up to thirty days.
2 Furnace shall have a hot zone capacious enough to accommodate a 4-point-1/4 bend sample with dimensions 3mm
thick by 9mm wide by 60mm long and appropriate fixturing as described in ASTM C1341-13
3 Shall have ports to accommodate an extensometer as applicable
4 Shall have inlet/outlet ports for purge gases.
Fixturing
1 Quoted system shall include fixtures for both standards indicated by this RFQ
2 Push/pull rods and fixturing solution for ASTM C1341-13 shall be rated for the maximum operating temperature
capability of the system.
2.1 Preferred that room-temperature fixturing is compatible with a Shimadzu AGX-V2
3 Fixturing for higher force capacities may be included as optional accessories.
Extensometer
1 Shall include a contact or optical extensometer:
1.1 Shall be configurable to meet the deflection measurement required by ASTM C1341-13
1.2 Shall have measurement capability that meets the stroke range of the load frame
1.3 Shall be rated for the maximum operating temperature capability of the system (i.e. if you offer a system capable of
1000 degreesC the extensometer must also be capable of operating at 1000 degreesC).
1.4 Shall include calibration/verification post install
MISSOURI STATE UNIVERSITY
RFQ 8458-26 Page 4 of 7
Pricing
State a firm, fixed total price to provide a Dynamic Mechanical Analysis/Fatigue Testing System:
$____________ firm, fixed total price
Specify brand and model number of item bid: _______________________________________________
Bid Submission Information and Requirements
1. The bidder must provide a detailed, itemized description of the proposed equipment to include all related
components and accessories. Such description should also include a written narrative which identifies the
relationship of each component or accessory to the specifications contained herein.
2. The bidder should provide any other relevant information that should be considered by Missouri State University
in evaluating the proposed equipment. The bidder is advised that the University is under no obligation to seek
out information regarding the proposed equipment if such information is not included as part of the bidder's
response.
3. All quoted prices must be firm and fixed and must include all required components and shipping/delivery costs
FOB Destination to Missouri State University in Springfield, Missouri.
4. Bid responses must be received in the Procurement Services Office of Missouri State University on or before 3:00
p.m. (CST) on March 26, 2026 in order to be considered for award. Responses received after the exact time on
the date specified will not be opened and will not be evaluated regardless of the reason(s) or mitigating
circumstances related to its lateness or degree of lateness.
Bidders are reminded that SEALED BIDS are required. Bid responses may NOT be faxed or e-mailed.
Please attach your formal quote to your sealed RFQ response.
Mail bid responses to:
The Board of Governors of Missouri State University
Procurement Services
Attention: Tanya Smith
901 South National Avenue
Springfield, Missouri 65897
Mark in lower left corner of envelope: Sealed RFQ 8458-26
MISSOURI STATE UNIVERSITY
RFQ 8458-26 Page 5 of 7
TERMS AND CONDITIONS, REQUEST FOR PROPOSAL/QUOTATION (RFP/RFQ)
I. TERMINOLOGY/DEFINITIONS
1. Bids and Bidders means the same as proposals and offerors.
2. Closing Date and Time or Date and Time Returnable means the deadline required for the physical receipt of bids by the Procurement Office.
3. Must and Shall mean that a certain feature, component, or action is mandatory. Failure to comply will result in rejection of the proposal.
4. Request for Proposal (RFP) or Request for Quotation (RFQ) means the procurement document issued by the Procurement Office to potential bidders for the
purchase of equipment, supplies, and/or services as described in the RFP/RFQ document. The definition includes these Terms and Conditions as well as any
other Attachments and Amendments to the RFP/RFQ.
II. OPEN COMPETITION/RFP/RFQ DOCUMENT
1. It is the offeror's responsibility to ask questions, request changes or clarification, or otherwise advise the Procurement Office if any language, specifications,
or requirements of the RFP/RFQ appear to inadvertently restrict or limit the requirements of the RFP/RFQ to a single source. Any and all communication
from bidders regarding the RFP/RFQ and the procurement process must be directed to the Buyer identified on the first page of the RFP/RFQ. Such
communication should be received at least five calendar days prior to the official Proposal Close Date.
2. The Procurement Office reserves the right to officially modify or cancel the RFP/RFQ after issuance. Bidders will be notified of any such modification or
cancellation by issuance of an addendum from the Procurement Office.
III. CONFLICT OF INTEREST
The contractor hereby covenants that at the time of the submission of the proposal the contractor has no other contractual relationships which would create any
actual or perceived conflict of interest. The contractor further agrees that during the term of the contract neither the contractor nor any of its employees shall
acquire any other contractual relationships which could create such a conflict.
IV. PREPARATION OF BIDS/PROPOSALS
1. Failure to carefully examine the RFP/RFQ and all terms and conditions related thereto will be at the Offeror's risk.
2. Unless otherwise specifically stated in the RFP/RFQ, all specifications and requirements constitute minimum requirements. All bids must meet or exceed the
stated specifications and requirements.
3. Bids lacking any written indication of intent to offer an alternate brand or to take an exception shall be considered to be in full compliance with the specifications
and requirements of the RFP/RFQ.
4. All equipment and supplies offered must be new and of current production and available for marketing by the manufacturer unless the RFP/RFQ clearly
specifies that used, reconditioned, or remanufactured equipment and supplies may be offered.
5. Prices quoted by the offeror must remain valid for a minimum of ninety (90) days from the date of proposal opening. If the proposal is accepted, prices shall
remain firm for the specified period.
V. SUBMISSION OF BIDS/PROPOSALS
1. Bids must be signed by a duly authorized representative of the offeror's organization and must contain all necessary information in the manner required by the
RFP/RFQ.
2. A bid may only be modified or withdrawn (1) by signed, written notice received by the Procurement Office prior to the Proposal Close Date and Time or (2)
in person by the offeror or its authorized representative, provided proper identification is presented before the Bid Close Date and Time. Telephone requests
to withdraw or modify a proposal will not be honored.
3. Bidders must, as a minimum, sign and return the RFP/RFQ cover page or, if applicable, the cover page of the last amendment thereto in order to constitute
acceptance by the offeror of all RFP/RFQ terms and conditions. Failure to do so will result in rejection of the proposal unless the offeror's full compliance
with those documents is indicated elsewhere within the offeror's response.
VI. QUOTATION/PROPOSAL OPENING
1. All bids will be opened at 3:00 p.m. on the date indicated. Prices will not be made available at that time and will not be made public until the evaluation is
complete and an award is made.
2. It is the offeror's sole responsibility to ensure that the proposal is delivered to the Procurement Office by the Proposal Close Date and Time. If the Procurement
Office is officially closed on the Proposal Close Date, bids will be accepted until 3:00 p.m. the next official work day and will be opened at that time.
3. Bids which are not received by the Procurement Office prior to the Proposal Close Date and Time will be considered late, regardless of the degree of lateness
or the reason related thereto. Late bids will not be opened.
MISSOURI STATE UNIVERSITY
RFQ 8458-26 Page 6 of 7
VII. EVALUATION/AWARD
1. An award will be made to the offeror whose proposal (1) complies with all mandatory specifications and requirements of the RFP/RFQ and (2) is the best
proposal, price and other factors considered.
2. The right is reserved, as the interests of the University may require, to reject any or all bids and to waive any minor informality or irregularity in bids received.
The Procurement Office reserves the right to request written clarification of any portion of the offeror's response if deemed necessary in order to verify the
intent of the offeror.
3. The University reserves the right to make awards on an item by item basis, or on an all or none basis, as applicable, if deemed in the best interests of the
University.
4. Any award shall be made only by written notification from the Procurement Office. For protest procedures see
http://www.missouristate.edu/procurement/65870.htm, Protests.
5. All bids and associated documentation received on or before the Proposal Close Date and Time will be considered open records pursuant to Section 610.021
RSMo.
VIII. REMEDIES AND RIGHTS
1. No provision in the contract shall be construed, expressly or impliedly, as a waiver by the University of any existing or future right and/or remedy available by
law in the event of any claim by the University of the contractor's default or breach of contract.
2. The contractor understands and agrees that the contract shall constitute an assignment by the contractor to the University of all rights, title, and interest in and
to all causes of action that the contractor may have under the antitrust laws of the United States or the State of Missouri for which causes of action have accrued
or will accrue as the result of, or in relation to, the particular equipment, supplies, and/or services purchased or procured by the contractor in the fulfillment of
the contract with the University.
IX. DELIVERY, INSPECTION, AND ACCEPTANCE
1. Delivery of equipment, supplies, and/or services must be made no later than the time stated in the contract, or within a reasonable period of time if a specific
time is not stated.
2. No equipment, supplies, and/or services received pursuant to the contract shall be deemed accepted until the University has had reasonable opportunity to
inspect the same.
3. All equipment, supplies, and/or services which do not comply with the RFP/RFQ specifications and/or requirements or which are otherwise unacceptable or
defective may be rejected. In addition, all equipment, supplies, and/or services which are discovered to be defective or which do not conform to any warranty
of the contractor upon inspection (or at any later time if the defects contained were not reasonably ascertainable upon the initial inspection) may be rejected.
4. The University reserves the right to return any such rejected shipment at the contractor's expense for full credit or replacement and to specify a reasonable date
by which replacements must be received. Signing the Bill of Lading shall not constitute acceptance of the shipment.
5. The University's right to reject any unacceptable equipment, supplies, and/or services shall not exclude any other legal, equitable or contractual remedies the
University may have.
X. CANCELLATION OF CONTRACT
1. In the event of material breach of contractual obligations by the contractor, the University may cancel the contract. If the contractor fails to cure the breach
within an acceptable time frame, or if circumstances demand immediate action, the University will issue a notice of cancellation terminating the contract
immediately.
2. If the University cancels the contract for breach, the University reserves the right to obtain such equipment, supplies, and/or services from other sources and
charge the contractor for any additional costs incurred as a result thereof, including attorney fees and court costs.
3. The contractor understands and agrees that funds required to fund the contract must be appropriated by the General Assembly of the State of Missouri for each
fiscal year included within the contract period. The contract shall not be binding upon the University for any period in which funds have not been appropriated,
and the University shall not be liable for any costs associated with termination caused by lack of appropriations.
XI. WARRANTY
1. The contractor expressly warrants that all equipment, supplies, and/or services provided will (1) conform to each and every specification, drawing, sample or
other description provided as part of the RFP/RFQ, (2) be fit and sufficient for the purpose expressed in the RFP/RFQ, (3) be merchantable, (4) be of good
materials and workmanship, and (5) be free from defect.
2. Such warranty shall survive delivery and shall not be deemed waived either by reason of the University's acceptance of, or payment for, said equipment,
supplies, and/or services.
XII. APPLICABLE LAWS AND REGULATIONS
1. The contract shall be construed according to the laws of the State of Missouri. In the event of any litigation arising hereunder, the parties agree that venue
shall be proper only in the State Circuit Court for Greene County, Missouri. The contractor shall comply with all local, state, and federal laws and regulations
related to the performance of the contract to the extent that the same may be applicable.
MISSOURI STATE UNIVERSITY
RFQ 8458-26 Page 7 of 7
2. To the extent that a provision of the contract is contrary to the Constitution or laws of the State of Missouri or of the United States, the provision shall be void
and unenforceable. The balance of the contract shall remain in force between the parties unless terminated by consent of both the contractor and the University.
3. The contractor must be registered with and maintain good standing with the Secretary of State of the State of Missouri and other regulatory agencies as may be
required by law or regulation.
4. The contractor must file and pay in a timely manner all Missouri sales, withholding, corporate and any other required Missouri taxes.
XIII. INVOICING AND PAYMENT
1. Payment for all equipment, supplies, and/or services required herein will be made in arrears.
2. Invoices must be directed to the Procurement Office and must include the contract number or purchase order number, item number, contract description of
supplies or services, sizes, quantities, unit prices, and extended totals.
3. Invoices shall be subject to late payment charges as provided for in Section 34.055 RSMo.
4. The University does not pay state or federal taxes unless otherwise required by law or regulation.
5. The University assumes no obligation for equipment, supplies, and/or services shipped or provided in excess of the quantity ordered. Any unauthorized
quantity is subject to rejection by the University and shall be returned at the contractor's expense.
6. The contractor shall not transfer any interest in the contract, whether by assignment or otherwise, without the prior written consent of the University.
XIV. NON-DISCRIMINATION AND AFFIRMATIVE ACTION
1. In connection with the furnishing of equipment, supplies, and/or services under the contract, the contractor and all subcontractors shall agree not to discriminate
against recipients of services or employees or applicants for employment on the basis of race, color, religion, national origin, sex, age, disability, or veteran
status. If the contractor or subcontractor employs at least 50 persons, they shall have and maintain an affirmative action program which shall include:
a.) A written policy statement committing the organization to affirmative action and assigning management responsibilities and procedures for evaluation
and dissemination;
b.) The identification of a person designated to handle affirmative action;
c.) The establishment of non-discriminatory selection standards, objective measures to analyze recruitment, an upward mobility system, a wage and salary
structure, and standards applicable to layoff, recall, discharge, demotion, and discipline;
d.) The exclusion of discrimination from all collective bargaining agreements; and
e.) Performance of an internal audit of the reporting system to monitor execution and to provide for future planning.
2. Vietnam Era Veterans' Readjustment Assistance Act of 1974 (VEVRAA) for Contracts of $100,000.00 or More
This contractor and subcontractor shall abide by the requirements of 41 CFR 60-300.5(a). This regulation prohibits Discrimination against qualified
protected veterans, and requires affirmative action by covered prime contractors and Subcontractors to employ and advance in employment qualified
protected veterans.
3. Disability Rehabilitation Act of 1973 Section 503 for Contracts in Excess of $10,000.00
This contractor and subcontractor shall abide by the requirements of 41 CFR 60-741.5(a). This regulation prohibits discrimination against qualified
individuals on the basis of disability, and requires affirmative action by covered prime contractors and subcontractors to employ and advance in
employment qualified individuals with disabilities.
XV. AMERICANS WITH DISABILITIES ACT
In connection with the furnishing of equipment, supplies, and/or services under the contract, the contractor and all subcontractors must comply with and be
responsible for all applicable requirements and provisions of the Americans with Disabilities Act (ADA).
XVI. REQUIREMENTS FOR PRIME CONTRACTORS
AND SUBCONTRACTORS
1. Each prime contractor and subcontractor shall file annually, on or before the 31st day of March, complete and accurate reports on Standard Form 100 (EEO-1)
promulgated jointly by the Office of Federal Contract Compliance Programs, the Equal Employment Opportunity Commission and Plans for Progress, or such
form as may hereafter be promulgated in its place, if such prime contractor or subcontractor (i) is not exempt from the provisions of these regulations in
accordance with 60-1.5; (ii) has 50 or more employees; (iii) is a prime contractor or first tier subcontractor; and (iv) has a contract, subcontract or purchase
order amounting to $50,000 or more or serves as a depository of government funds in any amount, or is a financial institution which is an issuing and paying
agent for U.S. savings bonds and savings notes: Provided, that any subcontractor below the first tier which performs construction work at the site of construction
shall be required to file such a report if it meets the requirements of paragraphs (i), (ii), and (iv) of this section.
2. Facilities provided for employees must be provided in such a manner that segregation on the basis of race, color, religion, or national origin cannot result.
XVII. ACCESSIBILITY OF DIGITAL MATERIALS
Any contract database delivered under this Request for Proposal will be fully compliant with i) Section 508 of the Rehabilitation Act, the Americans with Disabilities
Act, as amended ("Acts"), and ii) the Web Content Accessibility Guidelines (WCAG) 2.0 AA. Should any portion of a contract database not conform to the
aforementioned standards of digital accessibility, offeror agrees to defend, indemnify and hold harmless University, its officers, directors, successors, employees
and agents harmless from and against any and all third-party claims, liabilities, obligations, judgment, causes of action, costs and expenses (including reasonable
attorneys' fees) ("Claims") against University to the extent such claim(s) is/are based on allegations that the materials are not compliant with the above referenced
standards of digital accessibility in i) and ii).

With GovernmentContracts, you can:
Project: Boiler Replacement Ref. #: 27-11 Type: RFP Status: Open Open Date: Jul
Parkway School District
Bid Due: 8/07/2026
John Garland Park Landfill Gas System Improvements/Expansion PRJ-010156 StatusAccepting Bids Prebid Date 8/6/26
Drexel Technologies
Bid Due: 8/26/2026
Great Bend Waterpark - Great Bend, KS 242171.01 StatusAccepting Bids Prebid Date 8/4/26
Drexel Technologies
Bid Due: 8/20/2026
Plant 20 Chemical Phosphorous Removal PRJ-010201 StatusAccepting Bids Prebid Date 8/5/26 9:00am Bid
Drexel Technologies
Bid Due: 8/26/2026