| Location: | New York |
|---|---|
| Posted: | Sep 18, 2025 |
| Due: | Oct 16, 2025 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description: The project base bid primarily includes a full relining treatment along 125 ft of the steel pipe-arch segment. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including but not necessarily limited to the following: Cleaning the inside of the existing culvert pipe, providing construction access for workers, equipment and material, installation of stone filling, extension of existing drainage pipes and installation of a corrugated metal tunnel liner plate system to rehabilitate segments of the culvert pipe. Note that this project has bid alternates. The project add alternate includes a full relining treatment along 30 ft of the steel pipe-arch segment. This relining treatment will extend 5 feet into the steel arch on concrete footings segment. Due Date: 10/16/2025 11:00 AMContract Term: N/A Location: 42°54'07.9"N 78°40'13.9"W Ad Type: General
|

With GovernmentContracts, you can:
...20 Title: Transport of concrete and stone spoils Note: electronic bid submission only ...
The New York State Contract Reporter
Bid Due: 6/15/2026
...Follow Stone and Soil MBPA on Fort Drum Active Contract Opportunity Notice ID ...
DEPT OF DEFENSE
Bid Due: 4/01/2030
...Follow Stone and Soil MBPA on Fort Drum Active Contract Opportunity Notice ID ...
DEPT OF DEFENSE
Bid Due: 4/01/2030
...or medina stone to repair existing curbs along with sidewalk replacement where disturbed ...
City of Rochester
Bid Due: 9/09/2099