| Location: | Washington |
|---|---|
| Posted: | Jan 23, 2026 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The existing fire suppression system riser pipe has deteriorated and leaks at the coupling and requires replacement to maintain the fire suppression system integrity.
A Non-Mandatory Pre-Bid Meeting is scheduled for 10:00 am on Monday, January 12, 2026. Contractors shall meet on the sidewalk at the first level of the East entrance to the Corrections Center located at 707 W 13 th Street, Vancouver WA 98660.

With GovernmentContracts, you can:
...Project ID: ITB# TR0-6761 Title: Traffic Control Products, Roadway Barricades, Sign Blanks..., and ...
City of Seattle
Bid Due: 10/05/2026
...Project ID: ITB# TR0-6761 Title: Traffic Control Products, Roadway Barricades, Sign Blanks..., and ...
City of Seattle
Bid Due: 10/05/2026
...available to meet with clients who require this support and interpretation services. B. ...
Quinault Indian Nation
Bid Due: 9/27/2026
..., gloves and boots. Attendees will be required to sign a waiver prior ...
State Government of Washington
Bid Due: 10/07/2026