| Location: | South Carolina |
|---|---|
| Posted: | Apr 6, 2026 |
| Due: | May 7, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project includes the rehabilitation and maintenance of sewer collection system including installation of 7,594 linear feet of cured-in-place pipe liner, 2,971 linear feet of sewer pipe bursting from 6-inch pipe to 8-inch pipe diameter, sewer service reconnection, point repairs, rehabilitation of 49 manholes, and all incidental work and related restoration.

With GovernmentContracts, you can:
...18, 2026 - 3:00pm Project Location: Downtown Newberry Project Delivery Method: Design-Bid-Build... Obtained ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/18/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $200,000 to $265,000 Prime Contractor License...-310 INVITATION ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/16/2026
...Project Location: Dunnemann Apts Project Delivery Method: Design-Bid-Build Construction Cost Range... FOR DESIGN-BID-BUILD ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/14/2026
...Location: CJIS / IT Facility Project Delivery Method: Design-Bid-Build Construction Cost Range: $375,000...-310 ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/16/2026