| Location: | South Carolina |
|---|---|
| Posted: | Apr 6, 2026 |
| Due: | Apr 30, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 24137 |
| Publication URL: | To access bid details, please log in. |
Removal and replacement of existing suspended ceilings and lighting in designated corridor areas (approximately 7,951 sf at Central High School and 8,944 sf at Cheraw High School). New suspended ceiling system to be 2ft by 2ft grid systems with new 2’ x 4’ LED lighting. A non-mandatory pre-bid meeting will be held on 4/13/26 - 11:00 am at 649 Chesterfield Hwy, Cheraw SC 29520.

With GovernmentContracts, you can:
.... LIGHTING PROJECT Agency/Owner: Spartanburg County Ad Publish Date: May 18, 2026 Project ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/09/2026
..., 2026 - 2:00pm Project Location: Greenville, SC Project Delivery Method: Other Construction ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/11/2026
...Method: Design-Bid-Build Construction Cost Range: $400,000 to $450,000 Agency Project Coordinator...; wheel-stops, addition ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/18/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Sandra Marlowe... and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/09/2026