| Location: | South Carolina |
|---|---|
| Posted: | Sep 18, 2025 |
| Due: | Oct 16, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | D50-6171-SG |
| Publication URL: | To access bid details, please log in. |
Project scope includes a complete finishes upgrade of the third floor of the Wade Hampton Building. Finishes upgrade includes new carpeting and resilient flooring, wall paint, trim paint, ceiling tiles, and lighting fixtures. Minor reconfiguration of space includes division of two open office areas into private offices and storage, and the addition of a break room area in a former cubicle area. Scope includes hazardous materials abatement.

With GovernmentContracts, you can:
...9, 2026 - 11:00am Project Location: Wallace House Project Delivery Method: Design-Bid-Build.../ Project ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/09/2026
...Method: Design-Bid-Build Construction Cost Range: $900,000 to $1,000,000 Agency Project Coordinator... Details: https://scbo.sc.gov/files/scbo/P24-6104-PD_SE-310.pdf ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/11/2026
...Project Delivery Method: Design-Bid-Build Construction Cost Range: $375,000 to $415,000 Agency Project.../files/scbo/SE-310_D50-6188-JM.pdf Print ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/11/2026
...selected firm will provide architectural and engineering (A/E) design services . Construction... Project ...
Beaufort County
Bid Due: 7/01/2026