1. INTRODUCTION AND PROJECT OVERVIEW
The Town of Blacksburg, South Carolina, is seeking proposals from qualified firms to provide engineering
services for streetscape projects.
Proposed improvements include asphalt overlay, curb and gutter, sidewalks, ADA ramps, street lighting,
signage, and landscaping.
2. GENERAL INFORMATION AND KEY DATES
TOWN CONTACT
All questions regarding this RFQ must be submitted in writing via email to the Town Administrator no
later than close of business on February 11, 2026.
Contact: Shane Childers, Town Administrator
Email: shane@townofblacksburg.com
NOTE: The Town will not be bound by any oral interpretations or clarifications of the RFQ documents.
Proposers are responsible for clarifying any ambiguities in writing. Replies to questions will be issued as
formal Addenda to all Proposers.
The word “proposal” in this RFQ shall imply Statement of Qualifications (SOQ).
PROPOSAL SUBMISSION INSTRUCTIONS
Sealed proposals must be received at Town Hall, PO Box 487, 105 S. Shelby St., Blacksburg, SC 29702, no
later than 5:00 P.M. (EST) on February 23, 2026. Any proposals not received in person, must still be
received by the deadline, date of postage will not apply.
Proposals received after the deadline will not be accepted.
The proposal package shall contain one (1) original submittal, five (5) copies, and (1) electronic PDF
copy.
TOWN OF BLACKSBURG
RFQ #2026-1
2 OF 8
All proposals must be in a sealed envelope, clearly marked as follows:
TOWN OF BLACKSBURG, SC
RFP #2026-1: N. SHELBY STREET STREETSCAPE PROJECT
ATTN: SHANE CHILDERS, TOWN ADMINISTRATOR
105 S. SHELBY ST. BLACKSBURG SC 29702
3. PROJECT AREA
The proposed streetscape improvements will take place on N. Shelby Street, from W Cherokee Street to
W Carolina Street. The locations of the improvements are highlighted in the Streetscape Master Plan
Map included as Attachment A. The attached Streetscape Master Plan Map identifies three projects;
ARC/CDBG, Water Replacement, and SCDOT Tap. The services to be provided are for the ARC/CDBG
project area.
4. SERVICE TO PROVIDE
The engineer shall provide the following services:
A) PREPARATION OF PLANS AND SPECIFICATIONS
The engineer will design the streetscape improvements to meet the standards of the South
Carolina Department of Environmental Services and the Town of Blacksburg. The Blacksburg
Streetscape and Placemaking Master Plan provides guidance for understanding the Town’s
vision for developing the downtown area and is included as Attachment B. The engineer will be
responsible for obtaining all applicable permits and approvals for the project components
including but not limited to sidewalk upgrades and street lighting installation. The design
standards will include, but not be limited to the following:
i)Conduct all necessary field surveying.
ii)Prepare detail sheets for typical and special structures and prepare final quantity and
construction cost estimates
iii)Prepare contract specifications and documents including Notice and Instructions to Bidder,
Bid Form, Contract Agreement, General and Supplemental Conditions, Technical
Specifications, and the forms required by the grant.
TOWN OF BLACKSBURG
RFQ #2026-1
3 OF 8
iv)Provide surveying and mapping services necessary for the acquisition of right-of-way and/or
easements for the sidewalks and other project components, if necessary.
v) Anticipated Funding:
● Local Match $ 282,007 14%
● CDBG
$ 851,952 42%
● ARC
$ 890,092 44%
● Total Project $ 2,024,051
vi)Obtain SC DES, SC DOT, U.S. Army Corps of Engineers, and any other regulatory agency
permits and encroachment approvals, as needed.
vii)Meet with local officials and the Appalachian Regional Council of Governments to review
plans and cost estimates. Attend public meetings and conferences with the Town as
required.
viii)Take pictures and/or videotapes of the project area before construction.
B) CONTRACT ADMINISTRATION
The engineer shall provide contract administration services to include, but not be limited to:
i)Prepare all required bid documents and advertisements and make available required sets
and plans and specifications for bidding purposes.
ii)Prepare required addenda, if necessary.
iii)Attend and conduct bid opening. Tabulate bid qualifications, analyze, and make
recommendations to the Town.
iv)Attend and conduct a preconstruction conference.
v)Prepare contract documents and coordinate execution by the contractor and the Town.
vi)Check and approve necessary shop and working drawings. Review contractor’s insurance
coverage, schedules, and other submittals.
vii)Issue Notice to Proceed.
C) CONSTRUCTION OBSERVATION
The engineer will be required to provide construction observation services to include, but not be
limited to:
i)Make a minimum of once a week site visits to observe the progress and quality of the
contractor’s work.
ii)Inspect all materials and finished workmanship, check all layouts of work. Keep necessary
required records of inspections and review requests for payment to contractor.
iii)Prepare and present permanent easements and construction easements, if necessary.
TOWN OF BLACKSBURG
RFQ #2026-1
4 OF 8
iv)Conduct final inspection and coordinate inspections with necessary regulatory agencies.
v)Attend a public meeting once construction is finished to discuss completion of the project.
vi)Provide two sets of as-built drawings to the Town of Blacksburg and one set to the
Appalachian Regional Council of Governments.
5. PROPOSAL SUBMISSION REQUIREMENTS
Proposals should be simple, economical, and concise, providing a straightforward description of the
Engineer’s ability to meet the RFQ requirements.
This project will be funded in whole or in part by the Town of Blacksburg SC; the South Carolina
Department of Commerce, Grants Administration, under the Community Development Block Grant
Program (CDBG); and Appalachian Regional Commission (ARC). Grants will be administered by the
Appalachian Regional Council of Governments (ACOG). Federal requirements will apply to the contract.
The selected Engineer and other firms associated with the Engineer are required to be registered in the
federal System for Award Management (www.sam.gov) prior to award of contract. The selected
Engineer will be required to comply with the President’s Executive Order No. 11246 & Order No. 11375
which prohibits discrimination in employment regarding race, creed, color, sex, or national origin.
The following section outlines the requirements for the proposals and the RFQ process. Proposers are
cautioned to read this section carefully. Failure to provide all of the requested information may cause
the proposal to be rejected as non-responsive.
REQUIRED FORMAT AND ORGANIZATION
The proposal shall be organized and submitted with the following elements, in order:
A. Cover Page
B. Executive Summary: A brief, concise summary describing:
i. The firm’s ability to perform the scope of work.
ii. Firm’s history and experience with similar projects.
iii. Qualifications of staff to be assigned to this project.
iv. Any subcontractors and/or suppliers, including their background and experience.
C. Response to Scope of Work
i. Company and General Information
● Company name and address.
● Letter of transmittal signed by an authorized individual, stating compliance with
all RFP terms and conditions.
TOWN OF BLACKSBURG
RFQ #2026-1
5 OF 8
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.