| Location: | Ohio |
|---|---|
| Posted: | Jan 22, 2026 |
| Due: | Feb 10, 2026 |
| Agency: | State Government of Ohio |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SRC0000036549 |
| Publication URL: | To access bid details, please log in. |
| Solicitation ID: | SRC0000036549 |
| Solicitation Name: | Engineering Design - Fan Wall Replacement Project WGB | BWC260595 | FY26 | JD |
| Original Begin Date: | 1/22/2026 4:17:39 PM |
| Begin Date: | 1/22/2026 4:17:39 PM |
| End Date: | 2/10/2026 3:00:00 PM |
| Inquiry End Date: | 2/2/2026 12:00:00 AM |
| Commodity: | Structural engineering |
| MBE Set Aside: | MBE Set Aside |
| Agency: | BWC300810 FACILITIES WGBL |
| Solicitation Status: | Open for Bidding |
| Solicitation Type: | Quick Quote |
|
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
|
|||
|
Solicitation ID
SRC0000036549
|
|||
|
Solicitation Name
Engineering Design - Fan Wall Replacement Project WGB | BWC260595 | FY26 | JD
|
RFx Type
Quick Quote
|
||
|
Lot #
1
|
Solicitation Status
Open for Bidding
|
||
|
Round #
1
|
MBE Set Aside
|
||
|
Begin Date
1/22/2026 4:17:39 PM (ET)
|
Amendment?
|
||
|
End Date
2/10/2026 3:00:00 PM (ET)
|
Inquiry End Date
2/2/2026 12:00:00 AM
|
||
|
Summary
Provide comprehensive engineering design services for retrofitting existing air handling units (AHUs) with a modern fan wall system, including full replacement of hot water and chilled water coils, in a 33-story commercial high-rise. The goal is to improve HVAC performance, energy efficiency, and system redundancy while minimizing operational disruption.
**Review the Attached Document "SOW - Fan Wall William Green Building – 33-Story Building, Downtown Columbus"**
|
Predecessor Contract
|
||
|
Process
|
|||
|
Ship To
|
|||
1 Record(s)
|
0 Record(s)
|
5 Record(s)
|
Scope of Work
Fan Wall Engineering Design Services – 33-Story Building, Downtown Columbus
1. Objective
Provide comprehensive engineering design services for retrofitting existing air handling units (AHUs) with a modern fan wall system, including full replacement of hot water and chilled water coils, in a 33-story commercial high-rise. The goal is to improve HVAC performance, energy efficiency, and system redundancy while minimizing operational disruption.
2. Detailed Scope of Services
• HVAC Load Calculations: Full-building heating/cooling analysis, internal heat gains, summary report by floor and zone.
• Site Investigation: Multiple site visits, document mechanical rooms, verify as-built conditions.
• Fan Wall System Design: EC motor arrays, VFD-driven fans, duct transitions, electrical coordination, coil replacement with AHRI-certified hot water and chilled water coils.
• Phasing & Implementation Strategy: Maintain HVAC operation during installation, crane access, rigging paths, temporary solutions.
• Cost Estimating: Estimate including fan wall equipment, structural modifications, electrical upgrades, demolition, installation labor, coil replacement costs.
• Review & Coordination: Present findings, incorporate feedback into final design documents.
3. Deliverables
|
Deliverable |
Description |
|
HVAC Load Calculation Report |
PDF with summary tables and assumptions |
|
Fan Wall Design Drawings |
Mechanical, electrical, and structural sheets including coil replacement details |
|
Phasing & Implementation Plan |
Narrative and diagrams |
|
Preliminary Cost Estimate |
Itemized by system and trade, including coil replacement |
|
Review Meeting Presentation |
Slide deck and Q&A session |
4. Materials & Equipment (Design Basis)
• EC Fan Modules – 6–10 per wall, 208V or 460V
• Filters – MERV 13 pre-filter + MERV 15 final filter
• Hot water and chilled water coils – AHRI certified, full replacement
• Structural Steel – Welded frames, galvanized or painted
• Vibration Isolators – Spring or rubber-in-shear mounts
• Electrical Panels – New disconnects, breakers, and conduit
• BMS Integration – BACnet or Modbus-compatible
5. Estimated Pricing Breakdown
|
Task/Item |
Unit |
Quantity |
Unit Cost |
Total Cost |
|
HVAC Load Calculations |
Lump Sum |
1 |
||
|
Site Investigation & Documentation |
Lump Sum |
1 |
||
|
Fan Wall System Design |
Lump Sum |
1 |
||
|
Structural & Electrical Coordination |
Lump Sum |
1 |
||
|
Phasing & Implementation Strategy |
Lump Sum |
1 |
||
|
Preliminary Cost Estimating |
Lump Sum |
1 |
||
|
Coil Replacement |
Lump Sum |
1 |
||
|
Review Meeting & Final Deliverables |
Lump Sum |
1 |
6. Schedule
• Kickoff & Site Visits: January 2026
• Load Calculations & Preliminary Design: Feb–Mar 2026
• Final Design & Cost Estimate: First week of April 2026
• Review Meeting: April 2026
7. Assumptions
• Building access will be granted for all site visits.
• Existing system drawings and documentation will be made available.
• No hazardous materials present.
• Coil replacement will not require major structural modifications beyond supports.
8. Exclusions
• Construction or installation services
• Permitting and code submission (unless requested)
• Detailed commissioning services (available as an add-on)