| Location: | Colorado |
|---|---|
| Posted: | Jul 31, 2025 |
| Due: | Aug 14, 2025 |
| Agency: | Town of Parker |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Cottonwood Storm Phase 1 CIP24-020
Replacement of storm structures and earthwork of a stormwater pond located at the southeast corner of Parker Road and Cottonwood Drive. Work includes but is not limited to; demolition of a grouted rip-rap berm (451 SY), replacement of existing concrete forebay (56 CY), replacement of a concrete trickle channel (484 LF), installation of a maintenance access path (420 SY), replacement of an outlet structure (20 CY) and regrading and revegetating the existing pond bottom. |

With GovernmentContracts, you can: