| Location: | Idaho |
|---|---|
| Posted: | Dec 4, 2025 |
| Due: | Jan 20, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA489725R0008 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment #2: (Clerical errors corrected on 04 Dec, 2025)
This solicitation has been extended in order to allow for sufficient time for any interested party to submit a proposal as well as attend a site visit.
Please see below for pertinent information.
RFIs: RFI responses will be uploaded as soon as possible, but are not ready yet. When the questions are uploaded, another amendment will likely follow to update evaluation factors. We want to make this solicitation as competitive as possible, so there will likely be changes to evaluation factors C
Nov 3rd Site Visit sign-in included in attachments
Additional CAD drawings are available upon request. SAM will not allow for uploading of these documents.
Construction start date: No earlier than 1 June, 2026
Contact info: The phone number for SSgt Smith was input incorrectly on the solicitation document. His contact number is 208-828-0743
Mountain Home AFB, Idaho has a NAF requirement for a design-build service to replace the antiquated fire alarm system at the Sagebrush Inn, building 2320, with a new addressable fire alarm system, as required by the Fire Prevention Engineer. The design-build services shall develop a complete design with supporting specifications, analysis (with hazardous material survey for asbestos and lead-based paints), and proposed construction project schedule; followed by construction services to include demolition (to include abatement of any asbestos and lead-based paint if present); new installation, and commissioning fire alarm systems in accordance with Unified Facility Criteria (UFC); design drawings and specifications; and other design standards and guidance.
Building 2320 has an outdated fire alarm panel and devices which violate the Fire Code requirements. There are no replacement parts available for what is currently installed, which is driving the requirement for a replacement and upgraded system.
It is anticipated that the period of performance will be 407 calendar days from the Notice to Proceed. Design phase being limited to 212 days and construction phase to 180 with the remaining days being used for De-mobilization and Close-out.
Building 2320 will be occupied with Airmen and the everyday mission of those airmen should be minimally disrupted as much as possible. This project will be broken up into 3 phases. Phase 1 will be dedicated to the design of the project and result in the 65% design package being submitted to USG. At the same time the 65% design is delivered Phase 2, which is dedicated to construction, will kick off. Phase 3 will involve tasks finishing up construction, testing, demobilizing, etc.
See attachments below for all relevant documents.
For the proposal, all "if applicable" items shall be priced as if they are all applicable. Any proposals with these items not priced will be deemed unacceptable.
Site Visit:
A site visit for any interested parties will be held on January 6th, 2026 at 2:00 PM MST to walk through the facility and have any questions related to the design-build or technical aspects answered. This site visit is not mandatory, and all relevant questions will be recorded and posted to the solicitation after.
All interested parties will need to meet at the visitor's center at 1330 local (MST) to acquire day passes if you do not have base access already. The visitor's center is located just north of the main gate, on the west side of the highway. If you stay to the right as you approach the base, you can turn into the visitor center's parking lot about 100ft before the manned gate. Attempting to enter the base without a pass will result in a lengthy delay. We will be leaving the visitor's center at 1400 local time (MST).
Per the evaluation factors,
Questions must be submitted no later than 3:00 PM local (Mountain), Jan 12th, 2026
Proposals must be submitted no later than 3:00 PM local (Mountain), Jan 20th, 2026
Questions shall be directed to both POCs.
| Oct 16, 2025 | [Solicitation (Updated)] Fire Alarm System Replacement, Mountain Home AFB |
| Oct 17, 2025 | [Solicitation (Updated)] Fire Alarm System Replacement, Mountain Home AFB |
| Oct 30, 2025 | [Solicitation (Updated)] Fire Alarm System Replacement, Mountain Home AFB |
| Nov 19, 2025 | [Solicitation (Updated)] Fire Alarm System Replacement, Mountain Home AFB |
| Dec 1, 2025 | [Solicitation (Updated)] Fire Alarm System Replacement, Mountain Home AFB |
| Dec 19, 2025 | [Solicitation (Updated)] Fire Alarm System Replacement, Mountain Home AFB |
| Jan 14, 2026 | [Solicitation (Updated)] Fire Alarm System Replacement, Mountain Home AFB |

With GovernmentContracts, you can:
submission date project number project name 06-04-26 26019 Chinden B6, Postal Relocation, Department
State Government of Idaho
Bid Due: 6/04/2026
Post Date 05/19/2026 Quest Number 10215338 Category Code Lighting Systems,On Call Services Bid/Request
State Government of Idaho
Bid Due: 6/09/2026
Follow DWORSHAK DAM SHIPPING CONTAINERS WITH SIDE ACCESS DOORS Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 6/04/2026
submission date project number project name 06-09-26 24233 RE-BID 2 Maclntosh Manor Fire
State Government of Idaho
Bid Due: 6/09/2026