| Location: | Georgia |
|---|---|
| Posted: | Oct 2, 2026 |
| Due: | Nov 17, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-33561-NONST-2027-000000077 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-33561-NONST-2027-000000077 | AWTP-(2) 1000 Hp Reservoir Vertical Turbine | Macon Water Authority |
Oct 02, 2026 @ 01:10 PM
|
Nov 17, 2026 @ 02:00 PM
|
Start Date: Oct 02, 2026 @ 01:10 PM ET
End Date:
Nov 17, 2026 @ 02:00 PM ET
INVITATION TO BID
MACON WATER AUTHORITY MACON, GEORGIA
Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the installation of AWTP-(2) 1000 Hp Reservoir Vertical Turbine (the ¿Project¿) will be received by the Macon Water Authority (the ¿Owner¿), at the Macon Water Authority, 537 Hemlock Street, Dorothy Black Training Room, Macon, Georgia 31201 until 2:00 P. M., local time, November 17, 2026, and then at said office publicly opened and read aloud. All bidders must attend a mandatory pre-bid meeting at 703 River Bend Road, Amerson Water Treatment Plant, Administration Building Lobby, Macon, GA at 10:00 A.M. on November 3, 2026. All bid questions must be submitted to the Owner by 10:00 A.M. on November 9, 2026. The Bidder should attend the pre-bid meeting in its entirety.
The Project consists of furnishing all labor, materials, equipment, tools and incidentals required for the installation (replacement) of two (2) 1000 HP motors at the Amerson Water Treatment Plant (AWTP) Reservoir Pump Station. Winning bidder must provide, install and laser-align the motors. Installation will include providing a crane, removing and replacing the pump house roof, existing motor removal and transport to on-site storage location, providing provisions for vibration detectors 90 degrees apart with ¼-28 UNF tapped hole to mount our sensors, providing (and laser aligning shafts) a new coupling for each unit, making all electrical disconnections and reconnections, installing a vibration system (and ensuring proper operation), performing vibration analysis before and after new motor installation, and all other tasks, requirements, and specifications outlined in the contract documents.
The Owner reserves the right to reject any or all Bids. The Owner reserves the right to waive informalities and technicalities.
The Macon Water Authority
Michel Wanna
Executive Director & President
| Code | Description |
| 93663 | Pumps, Vertical, Maintenance and Repair |
| 94164 | Motors, Vertical, Maintenance and Repair |
| 93691 | Water Supply and Sewage Treatment Equipment Maintenance and Repair |
| 93662 | Pumps and Pump Accessories Maintenance and Repair |
Jay Payne
jpayne@maconwater.org
4784646521
00020-1
Invitation to Bid
SECTION 00020
INVITATION TO BID
THE MACON WATER AUTHORITY
MACON, GEORGIA
Sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the
installation of AWTP-(2) 1000 Hp Reservoir Vertical Turbine (the "Project") will be received by the
Macon Water Authority (the "Owner"), at the Macon Water Authority, 537 Hemlock Street, Dorothy
Black Training Room, Macon, Georgia 31201 until 2:00 P. M., local time, November 17, 2026, and
then at said office publicly opened and read aloud. All bidders must attend a mandatory pre-bid
meeting at 703 River Bend Road, Amerson Water Treatment Plant, Administration Building Lobby,
Macon, GA at 10:00 A.M. on November 3, 2026. All bid questions must be submitted to the Owner
by 10:00 A.M. on November 9, 2026. The Bidder should attend the pre-bid meeting in its entirety.
The Project consists of furnishing all labor, materials, equipment, tools and incidentals required
for the installation (replacement) of two (2) 1000 HP motors at the Amerson Water Treatment
Plant (AWTP) Reservoir Pump Station. Winning bidder must provide, install and laser-align the
motors. Installation will include providing a crane, removing and replacing the pump house
roof, existing motor removal and transport to on-site storage location, providing provisions for
vibration detectors 90 degrees apart with 14-28 UNF tapped hole to mount our sensors, providing
(and laser aligning shafts) a new coupling for each unit, making all electrical disconnections and
reconnections, installing a vibration system (and ensuring proper operation), performing
vibration analysis before and after new motor installation, and all other tasks, requirements, and
specifications outlined in the contract documents.
The contract time will be one hundred and eighty (180) consecutive calendar days beginning
from the effective date shown in the Agreement for Services-Section 00500, contained in the
contract documents.
The Project will be awarded in one Contract. Fifty-one percent (51%) of the Work under the
Contract Documents must be self-performed by the Contractor. The Project will be awarded by
base bid [or "by base bid plus selected alternates"] on a lump sum basis for the performance and
completion of all Work required by the Contract Documents.
The Contract Documents include, but may not be limited to, the Instructions to Bidders, the
Contract Agreement, the General Conditions, the Drawings, the Specifications (Divisions 01
through 46, inclusive, where applicable), and the forms of Bid Bond, Performance Bond, and
Payment Bond. These and any other Contract Documents may be examined at the following
location:
Engineering Department
Macon Water Authority
537 Hemlock Street
Macon, GA 31201
Rev. 01/26 10/2/2026 AWTP-(2) 1000 Hp Reservoir Vertical Turbine
00020-2
Invitation to Bid
Copies of Contract Documents may be obtained at the Engineering Department, Macon Water
Authority, 537 Hemlock Street, Macon, GA 31201, by contacting Jay Payne, Telephone: 478-738-
6521 upon a non-refundable payment of $150.00 for each set. A street address must be provided to
ensure prompt delivery. No partial sets of bidding documents shall be issued. Bidders must
purchase the Contract Documents in order to be eligible to submit a bid. Bid documents on
the MWA website are for informational purposes only.
Each Bid must be accompanied by a Bid Bond in the amount of 10% of the Bid, prepared on the
form of Bid Bond that is part of the Contract Documents, duly executed by the Bidder as principal
and having as surety thereon a surety company licensed to do business in the State of Georgia and
listed in the latest issue of U.S. Treasury Circular 570.
Bidders must comply with the Disadvantaged Business Enterprise Participation Requirements
specified in the Instructions to Bidders.
The successful Bidder for this Project shall be required to furnish a Performance Bond and Payment
Bond, satisfactory to the Owner, each in the amount of 100 % of the Contract Price.
Employment of Local Businesses and Contractors: It is the desire of the Owner that local
businesses be given the opportunity to participate on the various parts of the Work.
The Owner's encouragement of participation of locally owned businesses and contractors is not
intended to restrict or limit competitive bidding or to increase the cost of the Work. The Owner
supports a healthy, free market system that seeks to include responsible local businesses and provide
ample opportunities for local business growth and development.
In an effort to assist minority-owned businesses, Georgia law permits an income tax adjustment on
the state tax return of any company that subcontracts with a certified minority-owned firm to furnish
goods, property or services to the State of Georgia pursuant to O.C.G.A. 48-7-38. Suppliers should
consult with their tax advisors to find out how to take advantage of these tax credits.
The Owner reserves the right to reject any or all Bids. The Owner reserves the right to waive
informalities and technicalities.
The Macon Water Authority
Michel Wanna
Executive Director & President
END OF SECTION
Rev. 01/26 10/2/2026 AWTP-(2) 1000 Hp Reservoir Vertical Turbine

With GovernmentContracts, you can:
...Water Treatment Plant Raw Water Pump Station Emergency Power Hartwell, City Of Nov ...
State Government of Georgia
Bid Due: 12/04/2026
...Intent to Utilize Sole Source For City of Valdosta Water Treatment Plant Valdosta, ...
State Government of Georgia
Bid Due: 11/18/2026
...BID #27017 JG Beacham Water Treatment Plant Miscellaneous Coatings Athens-Clarke County Government... Oct ...
State Government of Georgia
Bid Due: 11/18/2026
..., Water, etc. 96896 Water and Wastewater Treatment Services 91392 Maintenance and Repair, ...
State Government of Georgia
Bid Due: 11/20/2026